My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2802
>
2300 - Underground Storage Tank Program
>
PR0516736
>
INSTALL_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:37 AM
Creation date
11/2/2018 6:51:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0516736
PE
2361
FACILITY_ID
FA0012764
FACILITY_NAME
SAFEWAY FUEL CENTER #1769
STREET_NUMBER
2802
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
2802 COUNTRY CLUB BLVD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\C\COUNTRY CLUB\2802\PR0516736\2001 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
97/85/2961 13:52 2934693433 `vJy v FIFTH FLOOR- <br /> v J vvJJ'v"JV PAGE 02 <br /> wR. ITI.EN MONITOWNG PROCEDURES <br /> UNDERGROUND STOPAGE TANK MONTI'ORING PROGRAM <br /> This monitoring program must be kept at the UST location at ul times. The information on WS mcnironng <br /> fy Sen niu 'County <br /> prof are conditions of the operadag permit. The permit holder mast notilea <br /> Environmental He <br /> altb Division,phone(209) 4683420 within 30 days of any changes ro the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name <br /> Facility Address <br /> A. Describe the frequency of performing the monitoring: <br /> Tank <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should he attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment_ <br /> )r. Reporting format for monitoring: <br /> Tank <br /> Piping <br /> F. Descrbe the preventive maintenance schedule for the monitoring equipment Note: <br /> Maintenance must be in accordance YAth the utanufactnrcrs' maintenance schedule <br /> but not less than every L months:_ <br /> G. Desenbe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: <br />
The URL can be used to link to this page
Your browser does not support the video tag.