Laserfiche WebLink
97/85/2961 13:52 2934693433 `vJy v FIFTH FLOOR- <br /> v J vvJJ'v"JV PAGE 02 <br /> wR. ITI.EN MONITOWNG PROCEDURES <br /> UNDERGROUND STOPAGE TANK MONTI'ORING PROGRAM <br /> This monitoring program must be kept at the UST location at ul times. The information on WS mcnironng <br /> fy Sen niu 'County <br /> prof are conditions of the operadag permit. The permit holder mast notilea <br /> Environmental He <br /> altb Division,phone(209) 4683420 within 30 days of any changes ro the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name <br /> Facility Address <br /> A. Describe the frequency of performing the monitoring: <br /> Tank <br /> Piping <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank <br /> Piping <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should he attached): <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment_ <br /> )r. Reporting format for monitoring: <br /> Tank <br /> Piping <br /> F. Descrbe the preventive maintenance schedule for the monitoring equipment Note: <br /> Maintenance must be in accordance YAth the utanufactnrcrs' maintenance schedule <br /> but not less than every L months:_ <br /> G. Desenbe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: <br />