Laserfiche WebLink
0 <br />Chevron Monitoring Certification Checklist <br />Store Number: —21099 <br />10997 I Address 1442A COLONY DR. RIPON, CA 95366 <br />* REGE1 VEP <br />Date: 1/27/2016 Technician: Jarrod Cooke Company:TANKNOLOGY9*4 r1CDA0T,fACAtT <br />Step <br />Instruction <br />Tank 1- PREMIUM <br />Tank 2 - REGULAR <br />Has Veeder Root Programming before & after been attached to the Work Order? <br />Yes <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Make a note if sensor label missing or illegible, & approx. cord length for -2081-209 with missing labels <br />Product <br />PREMIUM <br />REGULAR <br />112 Circum =151" <br />6' diameter <br />112 Circum = 113" <br />Tank Type <br />Fiberglass <br />Fiberglass <br />(DW FRP, DW Steel, SW FRP) <br />1 <br />Annular Riser Height (measured) <br />63.00 in. <br />64.00 in. <br />2 <br />Tank Diameter <br />0.00 in. <br />0.00 in. <br />For FRP tanks, 1/2 circumference of the tank <br />0.00 in <br />0.00 in. <br />3 <br />(see Note 1 below) <br />Required annular sensor length: <br />4 <br />FRP = Riser + 112 Circumference = step 1 +step 3 <br />63.00 in. <br />64.00 in. <br />Steel = Riser+ diameter = step 1 + step 2 <br />Mark & label the required sensor length on sensor cord. <br />5 <br />Label should be under the cap & serve to prevent the cord <br />Yes <br />Yes <br />being pulled too short. <br />FRP Tanks: Is the sensor installed with the marked <br />6 <br />required <br />Yes <br />Yes <br />length lining up with the top of the annular riser? <br />Steel Tanks: Is the sensor toughing bottom with slack <br />7 <br />above the marked required sensor length? <br />Are the DW pipe boots pulled back in tank sumps? <br />8 <br />(YIN or N/A, note !f can't be verified because clamshell <br />Yes <br />Yes <br />pointing down <br />Are tank sump sensors back in their holders and in the <br />9 <br />correct position? <br />Yes <br />Yes <br />(YIN or NIA document with photo) <br />Has the Veeder Root Battery been replaced & dated prior to failsafe? <br />(if battery backup failed, label and leave failed battery on top of console, note in comments and advise your OM) <br />Replaced Today <br />Has Veeder Root Programming before & after testing been printed & verified? <br />(especially tank manifolding setup - see Note 2) <br />Yes <br />Has Veeder Root Programming before & after been attached to the Work Order? <br />Yes <br />Have all sensor model numbers been verified against the Veeder Root cord label? <br />Make a note if sensor label missing or illegible, & approx. cord length for -2081-209 with missing labels <br />Yes <br />Additional Comments: <br />Note 1: <br />DW FRP Tank Circumference <br />(3.14x tank diam <br />1/2 Circum = <br />2 <br />10' diameter <br />112 Circum = 188" <br />8' diameter <br />112 Circum =151" <br />6' diameter <br />112 Circum = 113" <br />Note 2: Certain Veeder Root Software versions will automatically revert to the default <br />tank manifold settings any time the programming is changed, such as when sensors are <br />temporarily Wed out, etc. <br />