Laserfiche WebLink
! 0 REGELVEn[�2 <br />Spill Bucket Testing Report Form <br />FEB 0 2,015 <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form an <br />printouts from tests (if applicable), should be provided to the facility ownerloperator for submittal to the local regul ENWONMENTAL <br />f-1PA 17.t naC)4 0T4fi ch lT <br />1. FACILITY INFORMATION <br />Facility Name: CHEVRON 210997 (N-4693) Date of Testing: 1/27/2015 <br />Facility Address: 1442A COLONY DR., RIPON, CA 95366 <br />Facility Contact:PATTY Phone: 209-599-0149 <br />Date Local Agency Was Notified of Testing: <br />Name of Local Agency Inspector (if present during testing): <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: TANKNOLOGY INC. <br />Technician Conducting Test: Jarrod Cooke <br />Credentials I: I-' CSLB Contractor ry [CC Service Tech. r— SWRCB Tank Tester r Other (Specify) <br />License Number(s):5311523 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used By: r— Hydrostatic f—V Vacuum Other <br />Test Equipment Used: VACUUM TEST Equipment Resolution: 0.1 gph <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc.) <br />Spill Box #Tank <br />TI :SUPREME UNLEADED <br />PREMIUM - Fill I - Direct - <br />Grade level in containment <br />sump <br />Spill Box #Tank <br />T2:REGULAR UNLEADED <br />REGULAR- Fill I - Direct - <br />Grade level in containment <br />sum <br />Spill Box # <br />Spill Box # <br />Bucket Installation Type: <br />r Direct Bury <br />r Contained in Sump <br />Direct Bury <br />t" Contained in Sump <br />r Direct Bury <br />f+" Contained in Sump <br />C Direct Bury <br />fe— Contained in Sump <br />Bucket Diameter: <br />12.00 <br />12.00 <br />Bucket Depth: <br />12.0012.00 <br />Wait time between applying <br />vacuum/water and start of test <br />min <br />min <br />- <br />5 min <br />5 min <br />Test Start Time (Tl}: <br />Initial Reading (Rl): <br />Test End Time(TF): <br />09:20:00 <br />09:24:00 <br />30.00 in. H2O <br />30.00 in. H2O <br />09:21:00 <br />09:25:00 <br />Final Reading (RF): <br />30.00 in. H2O <br />27.00 in. HZO <br />Test Duration(TF—Tl): <br />I min <br />I min <br />Change in Reading (RF—RI): <br />0.00 in. H2O <br />-3.00 in. H2O <br />Pass/Fail Threshold or Criteria: <br />/ <br />+/-4.00 <br />+/-4.00 <br />Test Result: <br />Pass <br />Pass <br />Comments - (include information <br />on repairs made prior to testing, <br />and recommended follow-up <br />for failed tests) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: -1/ Date: 1/27/2015 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent <br />WO: 2320972 <br />