My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 � 0 <br />Page I of 1 <br />SPILL/OVERFILL CONTAINMENT BOXES <br />Facility is Not Equipped With Fill Riser Containment sumps r <br />Fill Riser Containment Sumps are Present, but <br />were Not Tested <br />I <br />Test Method Developed By: r Spill Bucket Manufacturerre Industry Standard Professional Engineer <br />(- Other (Specify): <br />Test Method Used By: (' Pressure vacuum to Hydrostatic <br />r Other (Specify): <br />Test Equipment Used: 0 <br />Equipment Resolution: <br />Spill Box # Spill Box <br />Tank T1:SUPREME UNLEADED PREMIUM Tank T2:REGULAR UNLEADED REGULAR. <br />Spili Box = <br />Spill Box <br />Fill - Direct Fill - Direct <br />Bucket Diameter: 12.00 12.00 <br />Bucket Depth: 12.25 12.25 <br />Wait time between <br />applying <br />pressure/vacuurn/water 5 min 5 min <br />min <br />rn i n <br />and starting test <br />Test Start Time: 09:05:00 09:05:00 <br />Initial Reading a,,): 12.00 in. 12.00 in. <br />Test Fncl Time: 10:05:00 10:05:00 <br />Final Reading �,): 12.00 in. 12.00 in. <br />Test Duration: 60 min 60 min <br />Change In Reading m,+,j <br />0.00 in. 0.00 in. <br />Pass/Fail Threshold or <br />+/- 0.00 0.00 <br />Criteria: <br />Test Result.- Pass .. .. .. .. .. .. Pass <br />
The URL can be used to link to this page
Your browser does not support the video tag.