My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Emergency Stop (E -Stop) Testing <br />.L,*; Tanknology Results & Checklist <br />Facility Information <br />Contractor Information TEST Results <br />Site #: 210997 <br />Address: 1442A COLONY DR. <br />City, State: RIPON, CA <br />Zipcode: 95366 <br />Lead Technician: Joey Mesa Date: 2/2/2012 <br />Name: Joey Mesa <br />Signature: I'+ Pass or r Fail <br />The objective of this test is to provide assurance that the when the E -Stop switch is activated, all the fueling system circuits (turbines, and <br />dispensers) are de -energized, and remain de -energized until they are re -set manually). The test procedures and guidelines shall be in <br />accordance with the E -Stop Testing Process. <br />The following information is to be completed. <br />X To Select <br />Yes <br />No <br />N/A <br />SITE DATA <br />1 <br />Number of E -Stop switches: 2 <br />2 <br />IType of Switch? r Push Pull rVivionnentary rpiain Light / Toggle r Other: <br />(if Momentary type, locate and identify re -set button): ,_IN BREAKER ROOM <br />3 <br />Type of Turbine Control Relay System (Electrical Distribution Center): <br />(Brown Box Power Solution r -Other rCustom Fabricated <br />4 <br />Type of Turbine Control Relays: Make: F.E. _PTRO Model: VFC- <br />5 <br />Type of Line Leak Detection: r -Mechanical J ELD/CPT rl/-PLLD <br />PERFORMANCE TEST <br />6 <br />Does the E -Stop shutdown power to the DISPENSERS <br />r <br />7 <br />Does the E -Stop shutdown power to the TURBINES <br />t- <br />8 <br />Are the TURBINE BREAKERS clearly identified /labeled <br />d� <br />r <br />9 <br />Did the E -Stops) function correctly (de-energi�ed from both sides of the relay) <br />t+ <br />9A <br />If #10 is NO, briefly describe what was wrong: <br />9B <br />How was it corrected: <br />9C <br />If repair or E -Stop functionality can not be corrected same day (prior to leaving the site). The <br />technician MUST notified the Site Manager of the problem, place an "Out of Service" Tag on the E- <br />Stop(s), and identified an alternate mean for site shutdown in the event of an emergency. <br />POST TEST <br />10 <br />Site's fueling system is fully operational <br />t+ <br />11 <br />All equipment secured and any access ports, lids, enclosures are closed. <br />�* <br />12 <br />All safety barricades, and any debris was been removed. <br />* <br />r <br />I <br />COMMENTS <br />Reference item e and describe observations/conditions where expectations are not met. <br />WO: 2301739 <br />
The URL can be used to link to this page
Your browser does not support the video tag.