Laserfiche WebLink
Page 3 of 9 <br />2. SECONDARY PIPE TESTING <br />Test Method Developed By. ❑ Piping Manufacturer Z Industry Standard [] Professional Engineer <br />Other (Specif <br />Test Method Used: Z Pressure ❑ Vacuum Hydrostatic <br />0 Other (Spec fv) <br />Tcst F.quipmctit Used: Ste :attached testing procedures Equipmont Resolution: <br />- w ^ <br />Piping Run #87 Piping Run #91 Vent <br />Piping Run # 87 Piping Run # 91 <br />Vent <br />Piping Material: <br />Fiberglass <br />Fiberglass - <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" 3" <br />3" <br />3" <br />Length of Piping Run: <br />1"5!1' 150' <br />15' <br />15' <br />Product Stored: <br />Regular <br />Premium <br />87 Vent <br />91 Vent <br />Method and location of <br />Clam Shell in sump <br />Clam Shell in sump <br />Test boot in sump <br />Test boot in sump <br />piping -run isolation: _ <br />Wait time between applying <br />30 minutes <br />30 minutes <br />pressure/vacuum/water and <br />30 minutes <br />30 minutes <br />starting test: <br />Test Start Time: <br />8:20am <br />Visual Fail <br />8:20atm <br />8:20am <br />Initial Reading (RI): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />9:20am <br />9:20am <br />9:20am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />'fest Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Criteria: <br />Test Result: <br />®Pass ❑FailPass <br />Fail <br />® Pass . ❑ Fail <br />M Pass <br />