My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 9 <br />1. SECONDARY PiPF. TESTING <br />❑ Piping Manu tuner Industry Standard ❑ Professional Engineer <br />Other (Spec�) <br />=Used: <br />19 Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Special <br />Test Equipment Used: See attached testing, procedures <br />Equipment Resolution: <br />Piping Run # V!R Yipino Run # <br />Piping Ruu # <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />411 <br />Length of Piping Run: <br />150' <br />Product Stored: <br />Vapor Return <br />Method and location of <br />isolation: <br />best boot in sumppiping-run <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes <br />Test Start Time: <br />8:37am <br />initial Reading (RI): <br />5 psi <br />Test End Time: <br />9:37am <br />Final Reading (RF): s <br />5 psi <br />Test Duration: <br />1 hour <br />Change in Reading (RF-Rj): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 <br />.0.00 <br />0.00 <br />0.00 <br />Test Result: ' <br />® Pass ❑ Fail <br />❑ Pass'` ❑� Fal <br />[I Pass. ;[] Fail <br />]Pass ..:!.E] Fail <br />— (include information on repairs made prior to testing, and recommended <br />
The URL can be used to link to this page
Your browser does not support the video tag.