Laserfiche WebLink
5. SECONDARY PIPE TESTING RECD J U L 20 2015 <br />Test Method Developed By: ❑ Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br />❑ Other (Specie) <br />Test Method Used: FZ] Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br />Piping Run # 87 <br />Piping Run # 91 <br />Piping Run # 87 Vent <br />Piping Run ## 91 Vent <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />Appx 200' <br />Appx 200' <br />Appx 20' <br />Appx 20' <br />Product Stored: <br />Gas 87 <br />Gas 91 <br />Vent <br />Vent <br />Method and location of <br />piping -run isolation: <br />Clamshell <br />Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 minutes <br />15 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />9:38am <br />9:38am <br />9:38am <br />9:38am <br />Initial Reading (Rr): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />10:38am <br />10:38am <br />10:38am <br />10:38am <br />Final Reading (RF): <br />5 PSI <br />b PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (Rr-Rr): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />0 <br />0 <br />0 <br />Test Result: <br />❑Pass ❑)Fail <br />❑Pass ❑Fail <br />❑✓ Pass ❑Fail <br />❑✓ Pass []Fail <br />Comments — (include information on repairs made prior to testing, and recommended fallow -up for failed tests) <br />