My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2011 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1442
>
2300 - Underground Storage Tank Program
>
PR0518458
>
COMPLIANCE INFO 2011 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/16/2022 11:14:22 AM
Creation date
11/2/2018 7:18:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011 - 2016
RECORD_ID
PR0518458
PE
2361
FACILITY_ID
FA0013918
FACILITY_NAME
CHEVRON STATION #210997*
STREET_NUMBER
1442
STREET_NAME
COLONY
STREET_TYPE
Dr
City
RIPON
Zip
95336
APN
26102028
CURRENT_STATUS
01
SITE_LOCATION
1442 Colony Dr
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\COLONY\1442\PR0518458\COMPLIANCE INFO 2011 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 RECD JUL 20 2015 <br />S. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: [D Pressure <br />❑ Other (Specify) <br />❑ vacuum ❑ Hydrostatic <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: PSI <br />Piping Run # VIR <br />Piping Run # <br />Piping Run H <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />4" <br />Length of Piping Run: <br />Appx 200' <br />Product Stored: <br />Vapor return <br />Method and location of <br />piping -run isolation:. <br />Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Test Boot in Sump <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 minutes <br />115 minutes <br />15 minutes <br />15 minutes <br />Test Start Time: <br />9:38am <br />Initial Reading (Rj): <br />5 PSI <br />PSI <br />PSI <br />PSI <br />Test End Time: <br />10:38am <br />Final Reading (RF): <br />5 PSI <br />PSI <br />PSI <br />PSI <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF -R,): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 <br />Test Result: <br />❑Pass ❑Fail <br />[]Pass ❑Fail <br />❑Pass ❑Fail <br />❑Pass ❑Fail <br />Comments — (include information on repairs made rior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.