My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January,2002 Job#: 029132 Page_of <br /> 4. TANK ANNULAR TESTING Job#: T7 029132 <br /> 1'est ethod Developed By: Tank Manufacturer InduAry Standard rOjPfofessional ffi),'Illeef <br /> Other(Specifi,) <br /> Test Method Used: no Pressure Vacuum Hydrostatic <br /> Other(,�pec�6-) <br /> Test Equipment Used: Equipment Resolution: <br /> 77 77-77 - ------- <br /> Tank# Tank# Tank# Tank# <br /> IsTank-Exempt From Testing?' X Yes El No El Yes Ej No El Yes El No El Yes El No <br /> Tank Capacity: 10000 <br /> Tank Material: DW FRP <br /> Tank Manufacturer: <br /> Product Stored: Diesel Diesel <br /> Wait time behveen appl�yiag <br /> pressure/vacuumAvater and <br /> swing test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj: <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: 0 Pass 0 Fail El Pass [3 Fail 0 Pass El Fail El Pass El Fail <br /> Was sensor removed for testing? Yes El No [I NA El Yes El No El NA 0 Yes El No El NA 0 Yes 0 No 0 NA <br /> Was sensor propefly replaced and 11 Yes El No [--1 NA El Ye5 El No El NA El Yes El No El NA El Yes 0 No [INA <br /> veri(i L!d functional after testing'� — — — -!-!nj <br /> Colunients— tinchule ij�fonnafion on repairs made prior to te-sting, <br /> Secondary containment systems where the continuous monitoring automatically monitors botli the phmary and secondary containment,such a <br />
The URL can be used to link to this page
Your browser does not support the video tag.