Laserfiche WebLink
SWRCB January,2002 Job#: 029132 Page_of <br /> 4. TANK ANNULAR TESTING Job#: T7 029132 <br /> 1'est ethod Developed By: Tank Manufacturer InduAry Standard rOjPfofessional ffi),'Illeef <br /> Other(Specifi,) <br /> Test Method Used: no Pressure Vacuum Hydrostatic <br /> Other(,�pec�6-) <br /> Test Equipment Used: Equipment Resolution: <br /> 77 77-77 - ------- <br /> Tank# Tank# Tank# Tank# <br /> IsTank-Exempt From Testing?' X Yes El No El Yes Ej No El Yes El No El Yes El No <br /> Tank Capacity: 10000 <br /> Tank Material: DW FRP <br /> Tank Manufacturer: <br /> Product Stored: Diesel Diesel <br /> Wait time behveen appl�yiag <br /> pressure/vacuumAvater and <br /> swing test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj: <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: 0 Pass 0 Fail El Pass [3 Fail 0 Pass El Fail El Pass El Fail <br /> Was sensor removed for testing? Yes El No [I NA El Yes El No El NA 0 Yes El No El NA 0 Yes 0 No 0 NA <br /> Was sensor propefly replaced and 11 Yes El No [--1 NA El Ye5 El No El NA El Yes El No El NA El Yes 0 No [INA <br /> veri(i L!d functional after testing'� — — — -!-!nj <br /> Colunients— tinchule ij�fonnafion on repairs made prior to te-sting, <br /> Secondary containment systems where the continuous monitoring automatically monitors botli the phmary and secondary containment,such a <br />