My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001 - 2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORONADO
>
3807
>
2300 - Underground Storage Tank Program
>
PR0231066
>
COMPLIANCE INFO 2001 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:52:22 AM
Creation date
11/2/2018 7:33:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001 - 2009
RECORD_ID
PR0231066
PE
2361
FACILITY_ID
FA0003819
FACILITY_NAME
Sprint United Managemnt Co.
STREET_NUMBER
3807
STREET_NAME
CORONADO
STREET_TYPE
Ave
City
Stockton
Zip
95204
CURRENT_STATUS
01
SITE_LOCATION
3807 Coronado Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\IAError\C\CORONADO\3807\PR0231066\COMPLIANCE INFO 2001 - 2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB January,2002 Job#: AW 029132 Page of <br /> .l�'JLyf IL]LLLµI(iiy LLJLLLLln L""U ,Ulj ILLVLLLLV 1yLi Vi 1 YVLL91LLLit MUYUII LLi,CUyAYllil.IL itVaii yiLV 6Li 11L111LLLi..1iL LYs71111�. �a..rulLViiLLu I..VUY r,1i <br /> Regulations,Title 23, Section 2637(a)(6)) <br /> 5, SECONDARY PIPE TESTING Job#: T7029132 <br /> Test Method Developed By: ©Piping Manufactuirer ® Iudustn-Standard ❑' Professional Engineer <br /> ❑�Other(Sped&) <br /> Test Method Used: Q Pressure ❑ vacuum ❑ Hydrostatic <br /> Q Other 0S wcif,) <br /> Test Equipment Used: Pressure with a 4"gauge Equipuj:nt Resolution: +/-0.25`/`- <br /> Piping <br /> 1_0,25%Piping Ran# Suppf Piping;Run# Return Piping Run# Piping Run# <br /> Piping Material: DW FRP DW FRP <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Dian►eter: 299 2' <br /> Length of Piping Run: 50, 50, <br /> Product Stored: Diesel Diesel <br /> Method fluid location of Test Reducer Boots Test Reducer Boots <br /> piping-run isolation: <br /> Wait tine between apphving - - - - <br /> pressurehacuun0vater and 15 min 15 min <br /> starting test: <br /> Test Start Tine: 10:00 10:00 <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 11:00 11:00 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 60 min, 60 min. <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: IN Pass p Fail Pass p Fail PPass ❑Fail'' p Pass ❑Fail <br /> Comments—Onclude h?fomiatlon oil repairs inade prior to testing and recorriiiieldded folloii--i!) for'failed testy) <br />
The URL can be used to link to this page
Your browser does not support the video tag.