Laserfiche WebLink
SWRCB January,2002 Job#: AW 029132 Page of <br /> .l�'JLyf IL]LLLµI(iiy LLJLLLLln L""U ,Ulj ILLVLLLLV 1yLi Vi 1 YVLL91LLLit MUYUII LLi,CUyAYllil.IL itVaii yiLV 6Li 11L111LLLi..1iL LYs71111�. �a..rulLViiLLu I..VUY r,1i <br /> Regulations,Title 23, Section 2637(a)(6)) <br /> 5, SECONDARY PIPE TESTING Job#: T7029132 <br /> Test Method Developed By: ©Piping Manufactuirer ® Iudustn-Standard ❑' Professional Engineer <br /> ❑�Other(Sped&) <br /> Test Method Used: Q Pressure ❑ vacuum ❑ Hydrostatic <br /> Q Other 0S wcif,) <br /> Test Equipment Used: Pressure with a 4"gauge Equipuj:nt Resolution: +/-0.25`/`- <br /> Piping <br /> 1_0,25%Piping Ran# Suppf Piping;Run# Return Piping Run# Piping Run# <br /> Piping Material: DW FRP DW FRP <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Dian►eter: 299 2' <br /> Length of Piping Run: 50, 50, <br /> Product Stored: Diesel Diesel <br /> Method fluid location of Test Reducer Boots Test Reducer Boots <br /> piping-run isolation: <br /> Wait tine between apphving - - - - <br /> pressurehacuun0vater and 15 min 15 min <br /> starting test: <br /> Test Start Tine: 10:00 10:00 <br /> Initial Reading(R,): 5 psi 5 psi <br /> Test End Time: 11:00 11:00 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 60 min, 60 min. <br /> Change in Reading(RF-RI): 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: IN Pass p Fail Pass p Fail PPass ❑Fail'' p Pass ❑Fail <br /> Comments—Onclude h?fomiatlon oil repairs inade prior to testing and recorriiiieldded folloii--i!) for'failed testy) <br />