Laserfiche WebLink
P. la-"ll'aa ; Gauging / SIR. Equ&ent: � Check this box if 4gauging is used only for inventory control. <br /> Clieck this box if no tardl gauging or SIR equipment is instullct! <br /> This Section Must be completed if intanlc gauging equipment is used to perform leak detection monitoring.. <br /> Cow[) Cte the following checklist: <br /> L7 1.'�s a No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults <br /> lJ �' s ❑ Nu* Wece all tank gauging probes visually inspected for damage and residue buildup? <br /> _❑ '�',:•5 J No* Was accuracy of system product level readings tested? <br /> U .�" ❑ No* Was accuracy of system water level readings tested? <br /> ❑ 't es ❑ No* Were all probes reinstalled properly? <br /> ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> la thu Scetion H, below, describe how and when these deficiencies were or will be corrected, <br /> C. i.ine Leal: Detectors (LLD): �11 Check this box if LLDs are not installed. <br /> Corti iliac rile fo!lovipg chaeldist: <br /> ❑ Yes. ❑ No* For equipment start-up or aiuival equipment certification, was a leak simulated to verify LLD perform.in ,: <br /> ❑ N/A (Cheek all that gpply) Simulated leak rate: 1❑ 3 g.p.h.; Cl 0.1 &p.h ; ❑ 0.2 g.p.h. <br /> IClYes CJNOWere all LLDs confirmed operational and accurate within rem latory requirements? <br /> JY rs ❑ No* Was the testing apparatus properly calibrated? <br /> C! Yes ❑ No* For inechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yrs ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> �] 1`es ❑ NO For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disilblcd <br /> ❑ N/A or disconnected? <br /> :1 es ❑ No* For electronic LLDs, does the urbine automatically shut off if any portion of the monitoring system malfunctic�tt; <br /> ❑ N/A or fails a test? <br /> C.l Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visual ly inspected? <br /> ❑ N/A <br /> CJJ Yes ❑ NO Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In rite Section H, below, describe how and when these deficiencies were or will be corrected. <br /> fl. Comments: <br /> Pa&e 3 of 3 u3,o1 <br />