Laserfiche WebLink
r <br /> 1� <br /> DSC 01 ZQ?4 <br /> 4.SECaNDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer <br /> ® industry Standard <br /> El Other(Specify) _ <br /> Test Method Used: 0 Pressure <br /> D �'=tcaum <br /> Q Other(Spec f.) ❑ Hydrostat ic <br /> Test Equipment Used: Test reducer boots, gauges and Nitrogen g >; —� I cluipraaent Resolution: O,S% of span <br /> Piping Run##$7 � Piping Run #91 <br /> HPiping Material: -- <br /> ___ Poly Poly <br /> E <br /> Piping Manufacturer: — -- <br /> Environ Environ ----_- <br /> Piping Diameter: 2" <br /> Length of Piping Run: too, i 00 <br /> Product Stored: Gasoline <br /> Method and location of Gasoline <br /> i in -run isolation: Reducer 13oots/i-ittings Reducer Bootsipittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: ]0 minutes <br /> Test Start Time: 9:30 am <br /> 9:30 am <br /> Initial Reading(Rr): 5 psi 5 psi <br /> Test End Time: 10:30 am10;30 am ....... <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr. - <br /> I hr. <br /> Change in Reading(RF-R& None Norte <br /> Pass/Fail Threshold or � <br /> Criteria: No detectable Loss No detectable Lass <br /> Test Result: ® Pass ❑Fail a Pass — <br /> CI hall <br /> COM MentS—Onclrrde information on repairs made pj,jor to testing and recommended follow-u or faded tests! <br /> Installer! new Disp# 314 to 87 & 91 Lines. _ <br />