Laserfiche WebLink
UST PROGRAM INSPECTORS WORKSHOP <br /> July 15, 2003 <br /> PLASTEELO PETRO-FIRSTTM UNITIZED UST SYSTEM <br /> AB 2481 MONITORING COMPLIANCE <br /> 1. TANK INTERSTICE. 2417 POSITIVE VACUUM, SWRCB APPROVED. <br /> 2. SUMPS: DISCRIMINATING SENSOR PROBE [VAPOR& LIQUIDS] SWRCB APPROVED. <br /> INSTALLATION PRIOR TO JULY 12004 <br /> 1. RETROFIT OF AB248I MONITORING AFTER INSTALLATION POSSIBLE. <br /> 2. RETROFIT AND 25290.10) TEST, =NO SB989 SECONDARY TEST REQUIREMENTS. <br /> DESIGN <br /> 1. ALL RISER PIPING, WELDED STEEL, WITHIN SUMPS. <br /> 2. NO EXTERNAL PIPING IN MONITORED MEDIA. <br /> 3. NO EXTERNAL PIPING TRANSITIONS TO MONITORED MEDIA. <br /> I. U.L. TESTED, LISTED& LABELED <br /> 2. PLASTEEL TANK <br /> TECHNOLOGY PARTNERS <br /> PLASTEEL INTERNATIONAL INC. PETRO-FIRST INC. <br /> 2541 STATE STREET SUITE 205 1811 NW 16TH STREET <br /> CARLSBAD, CA 92008 POMPANO BEACH, FL 33069 <br /> 760-729-1093 FAX 760-729-1096 954-971-9598 FAX 954-960-0318 <br /> Email: tanktech@piasteel.com Email: info(d),oranizestateind.com <br /> TM <br /> MANUFACTURED BY LICENSED PLASTEEL® PETRO-FIRST TANK MANUFACTURERS <br />