My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1996
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2305
>
2300 - Underground Storage Tank Program
>
PR0232470
>
REMOVAL_1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:32 AM
Creation date
11/2/2018 8:23:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1996
RECORD_ID
PR0232470
PE
2381
FACILITY_ID
FA0003521
FACILITY_NAME
AIRPORT PASSENGER CO
STREET_NUMBER
2305
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16909061
CURRENT_STATUS
02
SITE_LOCATION
2305 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\2305\PR0232470\REMOVAL 1996.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Noe <br />HEALTH AND SAFETY PLAN <br />RE: Airport Passenger <br />2305 S. Airport Way <br />Stockton, CA <br />Tank and Product <br />One (1) 2,000 gallon gasoline tank <br />Two (2) 4,000 gallon diesel tank <br />The project manager and health and safety coordinator is Lou Tvedt of Paydirt <br />Excavating Co. Inc. 269 Oregon St. , Ripon, CA 95366, Phone # (209) 599-2347 pager <br />no. (209) 995-0122. The site safety officer will be Lou Tvedt of Paydirt Excavating Co. <br />Inc. The alternative site of safety officer will be George Gilmore of Paydirt Excavating <br />Co. Inc. <br />Paydirt Excavating Co. Inc., will have on site two (2) fire extinguishers and one (1) first <br />aid kit within 50 feet of tank location (see map). No smoking will be permitted within 50 <br />feet of the tank or areas where flammable vapors are present. Two no smoking signs will <br />be posted at job site. Paydirt Excavating co. Inc. shall notify USA Dig 48 hours before <br />excavation shall begin. Tank will be emptied of product before start of job. Tank will be <br />triple rinsed, the rinsate will be pumped from the tanks, stored in barrels and the barrels <br />will be hauled by Refinery Services phone number 1-800-874-4444 address: 13331 N. <br />Hwy 33, Patterson, CA. Dry ice 30 pounds per tank will be used to inert the tanks. <br />Before lifting of tank, Paydirt Excavating co. Inc. shall monitor tank with a low <br />explosion level (LEL) monitor. We will seal an openings and one (1) plug will have an <br />1/8 inch opening before tank will be transported along with piping. At no time will <br />Paydirt Excavating co. Inc. cut or weld on site. Tank will be secured on truck after <br />excavation for transportation. Tank and plumbing will be hauled by by Paydirt <br />Excavating Co. Inc. to Cal -Coast Mfg. 1540 Lynwood, Turlock, CA 95380, phone (209) <br />668-9382. Paydirt Excavating Co. Inc. will approach all tank excavations with possible <br />cave-ins. The following rules will be followed to prevent any mishaps: <br />1. Soil will he inspected for stability before and after removal of tanks. <br />2. Soil to be at least two (2) feet from edge of an excavation. <br />3. If excavation is five (5) feet or more, the hole shall be tapered, braced, or other <br />equipment methods shall be used to prevent possible cave-ins, precautions will be at all <br />times. <br />
The URL can be used to link to this page
Your browser does not support the video tag.