Laserfiche WebLink
*,..i '../ <br /> SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Estes Trucking <br /> 7611 S.Airport Way <br /> Stockton,CA 95206 <br /> Date: May 7,2007 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X]Industry Standard [ ]Professional <br /> Engineer <br /> [ ]Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ]Hydrostatic <br /> [ ]Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run #1 Piping Run Piping Run Piping Run Piping Run <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: A. O. Smith <br /> Piping Diameter: 3"and 2" <br /> Length of Piping Run: 12 ft. <br /> Product Stored: Diesel <br /> Method and location of 3 x 2 Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5—Minutes <br /> starting test: <br /> Test Start Time: 8:15 A.M. <br /> Initial Reading(RI) 5 P.S.I. <br /> Test End Time: 9:15 A. M. <br /> Final Reading 5 P.S.I. <br /> Test Duration: 1 HOUR <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: [XI Pass.[ I Fail [ I Pass [ ] Fail [ ] Pass [ ] Fail [ ]Pass [ l [ l Pass [ I Fail <br /> Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />