My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:17:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2005 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2012
QuestysRecordDate
1/24/2018 7:33:04 PM
QuestysRecordID
3772154
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
*,..i '../ <br /> SWRCB.January 2002 <br /> Page 3 of 7 <br /> Job: Estes Trucking <br /> 7611 S.Airport Way <br /> Stockton,CA 95206 <br /> Date: May 7,2007 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: [ ]Piping Manufacturer [X]Industry Standard [ ]Professional <br /> Engineer <br /> [ ]Other(Spec) <br /> Test Method Used: [X]Pressure [ ]Vacuum [ ]Hydrostatic <br /> [ ]Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0.20 <br /> Piping Run #1 Piping Run Piping Run Piping Run Piping Run <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: A. O. Smith <br /> Piping Diameter: 3"and 2" <br /> Length of Piping Run: 12 ft. <br /> Product Stored: Diesel <br /> Method and location of 3 x 2 Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5—Minutes <br /> starting test: <br /> Test Start Time: 8:15 A.M. <br /> Initial Reading(RI) 5 P.S.I. <br /> Test End Time: 9:15 A. M. <br /> Final Reading 5 P.S.I. <br /> Test Duration: 1 HOUR <br /> Chane in Reading(Rf-RI) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: [XI Pass.[ I Fail [ I Pass [ ] Fail [ ] Pass [ ] Fail [ ]Pass [ l [ l Pass [ I Fail <br /> Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.