My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:17:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2005 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2012
QuestysRecordDate
1/24/2018 7:33:04 PM
QuestysRecordID
3772154
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%%owe .111.01 <br /> SWRCB.January 2002 Page 5 of 7 <br /> Site: Estes Trucking <br /> 7611 S. Airport Way <br /> Stockton,CA 95206 <br /> Date: May 7,2007 <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: [ ]UDC Manufacturer [X]Industry Standard [ ]Professional Engineer <br /> ( ]Other(Spec Jy) <br /> Test Method Used: [ ]Pressure [ ]Vacuum [X]Hydrostatic <br /> [ I Other(Spee) <br /> Test_ t"ment Used: CALDWELL SYSTEM E ui ment Resolution: 0.0025 <br /> . UDC# I 'UDC# UDC# -. .UDC# <br /> UDC Manufacturer I Bravo <br /> UDC Material: Steel <br /> UDC De the 1 9 Inch <br /> Height from UDC Bottom to <br /> Top of Highest Piping N/A <br /> Penetration: <br /> Height from UDC Bottom to <br /> Lowest Electrical Bottom <br /> Penetration: <br /> Condition of UDC prior to Dry <br /> testing: <br /> Portion of UDC Tested I 7 Inch <br /> Does turbine shut down ( ]YES[ ]NO [I YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> when UDC sensor detects [X]NA [ ]NA [ INA [ INA <br /> liquid(both product& <br /> water)? <br /> Turbine shutdown response N/A <br /> time: <br /> Is system programmed for [ ]YES [ ]NO [ ] YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> fail-safe shutdown? X NA NA NA NA <br /> Was fail-safe verified to be [ ]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO [ ]YES[ ]NO <br /> operational? WNA NA I INA f JNA <br /> Wait time between applying <br /> pressure/vacuum/water& 5 Minutes <br /> starting test <br /> Test Start Time: 8:00 A.M. <br /> Initial Reading 1): 7Inch <br /> Test End Time: 8:30 A.M. <br /> Final Reading 71nch <br /> Test Duration: 12 Hour <br /> Chane in Reading f-RI) -0- <br /> Pass/Fail Threshold or -0- <br /> Criteria: <br /> Test Result: [XI PASS I FAIL I I PASS I FAIL I I PASS' FAIL I PASS I I FAIL <br /> Was sensor removed for [ ]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO <br /> testing? X N/A N/A N/A <br /> Was sensor properly replaced [ ]YES [ ]NO [ ]YES [ ]NO [ ]YES [ ]NO <br /> and verified functional after [X]N/A [ ]N/A [ ]N/A <br /> test? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to ary of the questions <br /> indicated with an asterisk(•)is "NO"or"NA",the entire sump must be tested. (SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.