My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
7611
>
2300 - Underground Storage Tank Program
>
PR0231511
>
COMPLIANCE INFO 2005 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:35 AM
Creation date
11/2/2018 9:17:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2012
RECORD_ID
PR0231511
PE
2361
FACILITY_ID
FA0003695
FACILITY_NAME
ESTES TRUCKING
STREET_NUMBER
7611
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17705029
CURRENT_STATUS
01
SITE_LOCATION
7611 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\AIRPORT\7611\PR0231511\COMPLIANCE INFO 2005 - 2012.PDF
QuestysFileName
COMPLIANCE INFO 2005 - 2012
QuestysRecordDate
1/24/2018 7:33:04 PM
QuestysRecordID
3772154
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing`, <br /> Software Version Installed: 16.05 <br /> Com tete the following checklist: <br /> (x)Yes ❑ No* Is the audible alarm operational? <br /> (x)Yes ❑ No* Is the visual alarm operational? <br /> (x)Yes ❑ No* Were all sensors visually inspected, ctionally tested,and confirmed operational? <br /> (x)Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> (x)Yes ( )No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> ( )N/A operational? <br /> (x)Yes ( )No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ( )N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) El Sump/Trench Sensors; ❑ Dispenser Containment Sensors. <br /> Did ou confirm positive shut-down due to leaks and sensor failure/disconnection? El Yes; ❑No. <br /> (x)Yes ( )No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity doesthe alarm trigger? 90 % <br /> ( )Yes* (x)No Was any monitoring equipment replaced? If yes, identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> ( )Yes* O No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; ElWater. If es,describe causes in Section E,below. <br /> (x)Yes ❑ No* Was monitoringsystem set-up reviewed to ensure proper settings?Attach set u reports, if applicable <br /> (x)Yes L3No* Is all monitoring equipment oerational per manufacturer's specifications? <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System Certification Page 2 of 3 12/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.