Laserfiche WebLink
F. In-Tank Gauging/SIR Equi. ,icnt: ( ) Check this box if tank„/uging is used only for inventory control. <br /> ( ) Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Cing checklist: <br /> p(x)YYes <br /> ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No* Was accuracy of system product level readings tested? <br /> No* Was accuracy of system water level readings tested? <br /> ❑ No* Were all probes reinstalled properly? <br /> ❑ No* <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ( ) Check this box if LLDs are not installed. <br /> Com tete the folio in checklist: <br /> ❑O Yes ❑ No* For equipment star.-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: © 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> ❑O Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requiremarts? <br /> ❑X Yes ❑ No* Was the testing apparatus properly calibrated? <br /> D Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLDdetects a leak? <br /> El N/A <br /> ❑ Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> O N/A or disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any pertion of the monitoring system malfunctions <br /> O N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑% N/A <br /> ❑O Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist compleed? <br /> * In the Section H,below,describe bow and when these deficiencies were or will be corrected. <br /> IL Comments: — <br /> Monitoring System Certification Page 3 of 3 12/07 <br />