Excavations will be fenced off and samples (see sampling plan) will be taken. <br /> When it is determined that there has been no contamination the excavations will be <br /> backfilled immediately. Excavation and disposal of contaminated soils will be <br /> negotiated with the appropriate regulators. <br /> SAMPLING PLAN <br /> Soil samples will be taken at each underground storage tank site. A minimum of <br /> two samples one at each end of the tanks will be taken. The soil will be brought to <br /> the surface of the excavation where soil will be put into a brass sampling tube and <br /> kept cool per laboratory protocol. <br /> Soil underneath the removed leaded gasoline tank will be tested for: <br /> TPH-G8015,8260 <br /> BTX &E 8020,8260 <br /> Total Lead 7420,7421 <br /> mtbe 8020 <br /> Soil underneath the removed diesel tank will be tested for: <br /> TPH-138015,8260 <br /> BTX &E 8020,8260 <br /> mtbe 8020 <br /> In addition, the piping soil will be samples every 20 linear feet. No more than 20 <br /> linear feet of piping per tank is expected. <br /> BACKFILL <br /> As soon as no contamination is determined the site will be backfilled with the <br /> native soil (if clean) and pea gravel placed in 12 inch lifts. The last six inches of <br /> the excavation will be backfilled with baserock and compacted. The final 2 inches <br /> will be covered with asphalt. <br />