My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2300 - Underground Storage Tank Program
>
PR0231007
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 10:09:34 PM
Creation date
11/2/2018 9:30:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231007
PE
2381
FACILITY_ID
FA0003999
FACILITY_NAME
MARLER PROPERTY
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
02
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\75\PR0231007\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/29/2011 8:00:00 AM
QuestysRecordID
99238
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iftw <br /> Nw/ STATE OF CALIFORNIA r <br /> STATE WATER RESOURCES CONTROL BOARD W , <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, <br /> MARK ONLY ❑ I NEW PERMIT ❑ 3 RENEWAL PERMIT 5 CHANGE OF INFORMATION 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE B TANK REMOVED 1 �/ <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 7f ,C <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNERS TANK I.D.# 2- / 8. MANUFACTURED BY: U <br /> C. DATE INSTALLED(MO/DAYNEAR) �J7 D. TANK CAPACITY IN GALLONS: <br /> ILTANKCONTENTS IFA-11S MARKED,COMPLETE ITEM C. <br /> REGULAR <br /> A. MOTOR VEHICLE FUEL F--] 4 OIL B. C. ❑ 1aUNLEADEO 3 DIESEL ❑ g AVIATION GAS <br /> F-12 PETROLEUM ❑ m EMPTY 1 PRODUCT ❑ 1b PREMIUM Ed 4 GASANL ❑ 7 METHANOL <br /> UNLEADE❑ 1 5 <br /> 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADEDD E_] 99JOTHERL(DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.s: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,6,AND C,AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM � 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING �3 EPDXY LINING ❑ 4 PHENOLIC LININ. <br /> C.INTERIOR F-1 F-]5 GLASS LINING 6 UNLINED 95 UNKNOWN ❑ 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ N_ <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP2 COATING 3 VINYL WRAP ❑ 4 F113ERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION � ❑91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATIONCIRCLECIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IFAPPLICABLE <br /> A. SYSTEM TYPE A fI SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A®1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND Ao'l BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 10D% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ MONRORING ❑99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMAI;D�TE SSE MO/DAVIVR) 2. SUTBSTANCE REMAININGD QUANTITY � GALLONS 3 WAS ERT MATERIAL TANK FILLED I?H YES O NO❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED a SIGNANRE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBERS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# m F 9 <br /> 114 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS �/li 11 <br /> FORMS (12-91) <br />
The URL can be used to link to this page
Your browser does not support the video tag.