My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
75
>
2300 - Underground Storage Tank Program
>
PR0231007
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2021 10:09:34 PM
Creation date
11/2/2018 9:30:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231007
PE
2381
FACILITY_ID
FA0003999
FACILITY_NAME
MARLER PROPERTY
STREET_NUMBER
75
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11514007
CURRENT_STATUS
02
SITE_LOCATION
75 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ALPINE\75\PR0231007\BILLING.PDF
QuestysFileName
BILLING
QuestysRecordDate
11/29/2011 8:00:00 AM
QuestysRecordID
99238
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION• FORM B a <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION �K-7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM E] 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT B TEMPORARY TANK CLOSURE 8 TANK REMOVED J <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED SY: v l/ <br /> C. DATE INSTALLED(MOIOAYNEAR) lel- D. TANK CAPACITY IN GALLONS: 3" <br /> ILTANKCONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 1a REGULAR H 3 DIESEL <br /> A. -Tn7 MOTOR VEHICLE FUEL 4 OIL B. O. UNLEADED ❑ 6 AVIATION GAS <br /> ❑ 2 PETROLEUM ❑ 80 EMPTY �1 PRODUCT O 1b PREMIUM 4 GAS AHOL ❑ 7 METHANOL <br /> UNLEADED 5 JETFUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE O 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.0: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,8,AND C.AND ALL THAT APPLIES IN BOX D AND <br /> A. TYPE OF 1 DOUBLE WALL E�j 3 SINGLE WALL WITH EXTERIOR LINER L] 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANIQ ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM 8 100% METHANOL COMPATIBLE W/FRP <br /> (PrimaryTank) ❑ 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED 2 ALKYD LINING ❑ 3 EPDXY LINING 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING ❑ 6 UNLINED IN795 UNKNOWN 99 OTHER <br /> LINING <br /> IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES_ NO— <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP W 2 COATING O 3 VINYL WRAP O 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION t7-.9, -1 NONE Ej 95 UNKNOWN O 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EGUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IFABOVEGROUNDOR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A®1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION 4CIP 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND U BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100K METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODICPROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING ❑ 3 INTERSTITIAL <br /> MONITORING 99 OTHER <br /> V.TANK LEAK DETECTION <br /> VISUAL CHECK INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br /> TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.ESTIMATED DATE LAST USED(MO/DAYP/R) 2.ESTIMATED OUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL? <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANTS NAME DATE <br /> (PRINTED A SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY x TANK# „� <br /> STATE I.D.# p p 9�/y 9 o <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION•FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATION 131/ / <br /> `/ *40/F <br />
The URL can be used to link to this page
Your browser does not support the video tag.