My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ARCH AIRPORT
>
3131
>
2300 - Underground Storage Tank Program
>
PR0231514
>
REMOVAL_1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 9:18:44 AM
Creation date
11/2/2018 9:43:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1998
RECORD_ID
PR0231514
PE
2381
FACILITY_ID
FA0003818
FACILITY_NAME
U S POSTAL SERVICE-VEHICLE MAINT
STREET_NUMBER
3131
STREET_NAME
ARCH AIRPORT
STREET_TYPE
RD
City
Stockton
Zip
95213
APN
17927009
CURRENT_STATUS
02
SITE_LOCATION
3131 ARCH AIRPORT RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\A\ARCH AIRPORT\3131\PR0231514\REMOVAL 1998.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Project Location USPS Stockton V14F 3131 Arch Road Stockton CA <br /> Owner US Postal Service Phone No. (415) 742-6337 <br /> Contractor GHH Engineering, Inc Phone No.(916) 723-7645 _ License No. 537901 A Haz. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> _ 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> got 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br /> placed in the excavation in 12" lifts: <br /> _ A. Pea gravel--smooth, rounded material not more than one-half(1/2) inch in diameter <br /> }at B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between the <br /> backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days ofpproject completion, or submission of <br /> verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br /> Appendix Chapter 70. <br /> * Gary H. Hall <br /> Name ( tint) <br /> * Presi ent <br /> it [) <br /> * J� <br /> ignature <br /> * Shall be the responsible managing employee on the license or authorized agent. <br /> / I <br />
The URL can be used to link to this page
Your browser does not support the video tag.