Laserfiche WebLink
DOC-25—acs IZ:zeY PI rQ coraa.r r.�.. ..+•• <br /> DAILY BRWMGS <br /> 1. Inform each employee of what work reeds to be accomplished during the workday <br /> 2 Review any problems that may have occurred the prior day. <br /> 3. inform employees on the status of air Cluality. Review rcspiratordonning procedure if <br /> applicable <br /> 4. Inform employees on visitors to site that day. <br /> S. Review weather conditions and what signs to watch our t'or. If weather is going to be <br /> abnormal,take necessary breaks. <br /> 6. Reiterate the fact,that safety comes first. <br /> 7. Have open discussion with employees to answer any questions or problems. <br /> Alli AND PERSONAL MONITORING DEVISE <br /> We will be using the Gasim/ LEL. 02 Meter to monitor the concentrations of hydrocarbons & <br /> explosive mixture in the air and in the dirt The Gas Surveyor is calibrated weekly. <br /> PERSONNEL PROTECTIVE EOUIPMFNT <br /> Employees will work at Level D until air monitoring indicates a need for a change. Level D <br /> protection will consists of hard}tats,steel toed boots,ear and eye protection and romtal work clothes <br /> (Blue jeans and company shirts). When air monitoring indicates TPH levels above 50 PPM or <br /> Ilenzerrc levels above I-PPM respirators will be donned along with Tyvek suit.- and gloves. filter <br /> cartridge will be changed when break through is swhieved. At Level C air monitoring will be changed <br /> front every 15 minutes to every 5 minutes.When employees reach immediate break through on filter <br /> cartridge then the site will he evacuated <br /> SECIMING THE SITE <br /> Securing the aitc will consist of barricading the excavation with lighted barricades and barricade <br /> tape. All stockpiled soil will be covered with visqueen. The visgtuen will be secuaod with tires and <br /> rope to hold it in Tilace. <br />