Laserfiche WebLink
%AW .i <br /> compliance with the health and safety plan. If the designated Shaw Site Safety Officer must be <br /> absence, a qualified alternate will assume the SSO duties and responsibilities. <br /> 1.3 Work Objectives/Scope <br /> The scope of work for this project covered by this HSP is limited to temporary UST closure <br /> activities at the previously mentioned Pacific Bell facility. <br /> Activities Planned (Check those that are applicable): <br /> underground storage tank removal <br /> oversight of soil excavation with backhoe or other equipment <br /> confirmation soil sampling during soil excavation and removal <br /> geophysical survey <br /> soil boring and soil sampling with HSA or air rotary drilling <br /> groundwater grab sampling from monitoring wells <br /> groundwater sampling of on-site wells <br /> X other:temporary closure of USTs—hot pressure washing of tank interiors,pumping of residuals from <br /> tanks,visual inspection of the interiors of the tanks,transporting of collected residuals, inerfing of tank <br /> interiors,sealing tank pipes,and de-energizing the tanks <br /> cNCD;�Wusnm-oa Ae 1-2 <br />