My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2002 TEMP CLOSURE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EIGHT MILE
>
2300
>
2300 - Underground Storage Tank Program
>
PR0231893
>
REMOVAL_2002 TEMP CLOSURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:43:35 PM
Creation date
11/4/2018 2:16:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2002 TEMP CLOSURE
RECORD_ID
PR0231893
PE
2361
FACILITY_ID
FA0018028
FACILITY_NAME
AT&T CALIFORNIA - UE17L
STREET_NUMBER
2300
Direction
E
STREET_NAME
EIGHT MILE
STREET_TYPE
RD
City
Stockton
Zip
95210
APN
12002013
CURRENT_STATUS
02
SITE_LOCATION
2300 E EIGHT MILE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\E\EIGHT MILE\2300\PR0231893\TEMP CLOSURE 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%AW .i <br /> compliance with the health and safety plan. If the designated Shaw Site Safety Officer must be <br /> absence, a qualified alternate will assume the SSO duties and responsibilities. <br /> 1.3 Work Objectives/Scope <br /> The scope of work for this project covered by this HSP is limited to temporary UST closure <br /> activities at the previously mentioned Pacific Bell facility. <br /> Activities Planned (Check those that are applicable): <br /> underground storage tank removal <br /> oversight of soil excavation with backhoe or other equipment <br /> confirmation soil sampling during soil excavation and removal <br /> geophysical survey <br /> soil boring and soil sampling with HSA or air rotary drilling <br /> groundwater grab sampling from monitoring wells <br /> groundwater sampling of on-site wells <br /> X other:temporary closure of USTs—hot pressure washing of tank interiors,pumping of residuals from <br /> tanks,visual inspection of the interiors of the tanks,transporting of collected residuals, inerfing of tank <br /> interiors,sealing tank pipes,and de-energizing the tanks <br /> cNCD;�Wusnm-oa Ae 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.