Laserfiche WebLink
FIBERGLASS DOL E-WALL SUMP INSTALLATION STRUCTIONS <br /> INSPECTIONA. HANDLING AND FIGURE B-1 <br /> In freezing conditions,protect collar and sump from water INSERT CHANNEL MESH <br /> accumulation.Freezing water may cause damage. 360°IN EACH JOINT <br /> • Visually inspect the sump components for shipping <br /> damage. If damage is found, contact CSI Field <br /> Service. <br /> • Wear gloves. <br /> • Do not roll or drop. <br /> • Sump parts should be stored in upright position. <br /> • Set on smooth surface. <br /> Important: The sump must be secured to prevent • Position sump on collar(see figure B2). <br /> damage from high winds. Proper precautions should . Use a rubber mallet, if necessary to seat sump <br /> be taken to protect adhesive channels. on collar. <br /> INSTRUCTIONS0. ASSEMBLY • Confirm that surfaces and/or adhesive channels are <br /> dry and clean before mixing or applying the adhesive. <br /> FIGURE B-2 <br /> Sump must be isolated from direct traffic loading. <br /> • Dry fit all sump components. <br /> - Determine any length changes required to insure <br /> the minimum required clearance between the sump 4"lCollar <br /> top and concrete. Round Body <br /> - Confirm enclosure top and reservoir are level. Extension <br /> - Verify fill/vapor spill buckets are properly aligned Tst <br /> with lid opening. fort <br /> • If required,trim sump body extension using a carbide <br /> tipped blade or a masonry blade(see figure B-2). n Sand and <br /> • Field cuts must be within tY."of square (gaps d clean mating <br /> between two joints greater than 1/4" must be covered y surfaces <br /> with maximum width '/"tape). <br /> • Maintain a minimum of 4" on the round body <br /> extension to complete interior joint(see figure B-1). <br /> • Remove any rocks, and/or debris from channel. Test Plug <br /> • Sand and clean mating surfaces until white in color. T <br /> - Ensure mating surfaces are free of contaminants. <br /> - Do not use oil-based solvents, soap, or water to <br /> clean surfaces. <br /> - Adhesive Joints-Sand the surfaces that will <br /> contact the adhesive, then wipe free of dust with <br /> a clean cloth. <br /> - Layup Joints-Sand a minimum of 4"onto each <br /> part where the layup will be applied, then wipe free <br /> of dust with a clean cloth. <br /> • Insert channel mesh material provided with adhesive <br /> kit 3600 around each joint(see figure B-1). <br /> - Mesh is supplied longer than required. Trim end to <br /> fit without gap or overlap. <br /> 4 <br />