Laserfiche WebLink
FIBERGLASS UBLE-WALL SUMP INSTALLATI 1 INSTRUCTIONS <br /> ADHESIVEC. ALL ADHESIVE JOINTS (KIT AD) <br /> TEMPERATURE CONSIDERATIONS: Fallow these steps: <br /> • Recommended method for supplemental heat is to 1. Check adhesive container for expiration date. <br /> transfer warm air to the sump while keeping ignition 2. Thoroughly mix two part adhesive by hand or with <br /> sources away. a power mixer following the mixing instructions <br /> Cool Weather(less than 60'F): <br /> contained in the adhesive kit. <br /> • Preheat the resin or adhesive to 60-75°F. 3. t=ill channel with adhesive using the grout bag or <br /> application tool. <br /> • Before adhesive or layup is applied, add 4. Make two consecutive 360° passes with adhesive <br /> supplemental heat.Apply heat to keep joint surfaces <br /> over 60T. around each channel. <br /> • After adhesive or layup is applied, continue to apply 5. Allow adhesive to cure at least 24 hours without <br /> supplemental heat until it hardens (30 minutes moving the joined parts. <br /> minimum). FIGURE C-1 <br /> Warm Weather(between 61°F and 85°F): -ADW Body <br /> • Adhesive or hand layup will harden in approximately <br /> 30 minutes. Adhesive <br /> • No supplemental heat required. Adhesive <br /> Hot Weather(above 85°F): Channels <br /> • Apply adhesive or layup more rapidly (adhesive and <br /> resin may harden in less than 10 minutes). channel <br /> Mesh <br /> • To increase working time, cool the adhesive or resin <br /> to 60°F to slow down chemical reaction. <br /> ` DW Collar <br /> or Body <br /> The adhesive 1 resin materials and vapors are flammable. <br /> To prevent fire or explosion hazard, if a heat gun (or ALL LAYUP JOINTS (KIT LK) <br /> other ignition source) is used for supplemental heat,first <br /> evacuate flammable vapors which may accumulate in the Follow these steps: <br /> sump. <br /> Tank sumps may be a confined space. Follow proper 1. Thoroughly mix resin and catalyst following the <br /> safety procedures. mixing instructions in the layup kit. <br /> 2. Resin coat previously ground mating surfaces. <br /> r3. Apply 3 layers of glass layup saturated with resin <br /> 360°around sump, centered on joint.All layup <br /> joints must overlap a minimum of 1° but not <br /> exceed 2" in circumferential direction. <br /> ASPHYXIATION FIRE EXPLOSION 4. Roll layup until all air is removed. <br /> 5. Allow layup to cure at least 24 hours without <br /> moving the joined parts. <br /> Always wear protective goggles and gloves when mixing FIGURE C-2 <br /> and applying adhesive and resin.The liquid materials <br /> are flammable. Keep adhesive and resin away from - DW Body <br /> sparks and ignition sources. <br /> 4" 3" Layers of Glass <br /> wfResin(3'Past <br /> Each.Joint) <br /> 4„ <br /> DW Collar <br /> or Body <br /> 5 <br />