Laserfiche WebLink
Facility Name: Costco # 1031 Manteca (Page 2) <br />A Results of Testing/Servicing <br />Cam ulete the follosvJr ! checklist - <br />Software Version Installed: 328.03 <br />Z Yes ❑ No Is the audible alarm o Derational? <br />Yes ❑ No* Is the visual alarm p erational? <br />Ycs ❑ N°* Is the Tint function o erational? <br />Yes ❑ No Were all sensors visual! in ected, functionall tested, and confirmed o erational? <br />Yes ©N°* Were all sensors installed at lowest point of <br />nsecondary containment and positioned <br />riot interfere with their ro er Operation? <br />�] Yes <br />El If alarms are relayed to a remote monitoring station,is all communieationsso that other equipment wit! <br />❑ N/A operational'? <br />equipment e. <br />g. modem ) <br />Yes ❑ No* For pressurized piping systems, does the turbine automaticall11 y shut down if the pipingsecond <br />[j N/A monitoring system detects a leak, fails to operate, or is elect disconnected? <br />Positive shutdown? (Check all that apply) e ase containment <br />PPY) ®Sump Sensors; If yes: which sensors initiate <br />Did you confirm positive shutdown due to leaks and sensor failure/disconnection? <br />® Dispenser Containment Sensors. <br />Emet enc Shut Down ESD was tested and found to be wprkin at each station. ❑ No. <br />Yes, <br />� Yes ❑ Np* For tank systems that utilize the monitoring system as the primary tank overfill wamin <br />❑ N/A warning alarm visible and audible at the tank fill point(s) and operatin g device, is the overfill <br />ca acit does the alarm tri er? 90% g pr°PerIY• At what percent of tank <br />Yes* ❑ No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment re <br />and list the manufacturer name and model for ap re lacement arts in Section E, below. <br />Yes* P placed <br />No 13 Was liquid found inside any secondary containment systems designed as dry systems {Check all that app/v/ <br />Pro( ;t; El Water; ❑ Brine. If es, describe causes in Section E, below. <br />Yes ❑ No* Was mo,ritorin s stem set -u reviewed to ensure ro er settin s? Attach set u re orts, if a licable <br />Yes ❑ No* Is all monitoring a ui ment o erational er manufacturer's s ecilicatirnas'' <br />F. Comments: PLLD on the 91 STP, <br />