Laserfiche WebLink
�1_ <br />Facility Name: Costco # 1031 Manteca (Page 3) <br />In -Tank Gauging: <br />®Check this box <br />if tank gauging is <br />used only for inventory control and disregard following <br />section. <br />Cam fete followin checklist: <br />he <br />a Yes No* <br />Has all input wiring been inspected <br />❑ Yes ❑ No* <br />El <br />for proper entry and term <br />Were all tan -gauging including testingfor <br />au in ground faults? <br />g g Arabes visually inspected for <br />Yes ❑ No* <br />[01 Yes <br />damage and residue buildup? <br />Was accuracy of systee m product level readings tested? <br />El ❑ No* <br />Yes ❑ No* <br />Was accuracy of system wat11 e 11 r level readings tested? <br />11 <br />Q Yes ❑ No* <br />Were all probes reinstalled p ro11 perly? <br />Were all items on the equipment manufacturer's maintenance Ch <br />* In the Section H, below, describe how and ecist completed? <br />when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): <br />❑ Check this box if LLDs are not installed and disre and the follow, =section. <br />Yes Q No* <br />❑ N/A <br />®Yes ❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verifyL <br />Check all that a lvJ Simulated leak rate: 13 LD perforntance? <br />Yes ❑ No <br />h. ©U. i h -❑ 0? h. <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Was the testing apparatus <br />Q Yes ❑ No* <br />properly calibrated? <br />For mechanical I Is, doe <br />® NIA <br />- s the LLD restrict product flow if it detects a leak'? <br />Yes [] No* <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects <br />Yes ❑ No* <br />Q N/A <br />a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the <br />or disconnected? <br />Yes ❑ No* <br />❑ N/A <br />monitoring ' <br />gsstem is di <br />y disabled <br />For electronic LLDs, does the turbine automatically <br />® Yes ❑ Na* <br />shut off if an <br />malfunctions or fails a test? y portion of the monitoring system <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® Yes [I No* <br />* In <br />Were all items on the equipment manufacturer's maintenance Checklist completed? <br />the Section H, below, describe how and when these deficiencies <br />were or will be corrected. <br />H. Comments: We replaced a syphon jet, check valve and PLLD <br />all lines. <br />on the 91 STP. Installed snap taps for <br />