My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1991
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
12145
>
2300 - Underground Storage Tank Program
>
PR0508337
>
INSTALL_1991
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:28 PM
Creation date
11/4/2018 3:01:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1991
RECORD_ID
PR0508337
PE
2361
FACILITY_ID
FA0008040
FACILITY_NAME
SAN JOAQUIN AIR
STREET_NUMBER
12145
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
952429541
APN
05518005
CURRENT_STATUS
02
SITE_LOCATION
12145 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DE VRIES\12145\PR0508337\INSTALL 1991.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARROW TANK WORKS <br /> 1701 SOUTH BARNEY STREET <br /> Mailing Address: P.O. Box 563 <br /> ANDERSON, CALIFORNIA 96007 <br /> PHONE (916) 365-5434 <br /> INSTALLATION: <br /> We recommend that our underground tanks be installed with a minimum <br /> cover of two feel of compacted soil, or one foot of soil under a reinforced con- <br /> crete pad of not less than 4" thick. However, in areas where the installed tank <br /> will be subjected to vehicular traffic, they shall be protected by a minimum of <br /> 18" of compacted soil plus 6" of reinforced concrete, or 8'' of asphalt paving" <br /> extending at least one foot from the tank in all directions, or by a minimum of <br /> three feet of soil. The excavation shall be free of any liquid during the installa- <br /> tion procedure. <br /> The tanks shall be completely empty during installation to prevent any un- <br /> due stress within the tanks. If it is necessary to fill the tanks with product before <br /> backfilling, the product level must not exceed the compacted backfill level. <br /> The tank excavation shall be firm soil suitably graded level, and have 6" <br /> of clean sand or 6'' of pea gravel. The tanks shall be encompassed by clean <br /> sand or pea gravel. There shall be no stones or other matter allowed to come <br /> in contact with the tanks. <br /> If the installation site is such that the tanks require a concrete balast slab <br /> and hold down straps, refer to our hold down chart and NFPA pamphlet #30. <br /> Material used for backfill must be capable of being 95% compacted. The <br /> material shall be placed in 6'' layers and tamped down. Cradles or chocking <br /> blocks should not be used. They may cause tank failure due to stress <br /> concentrations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.