My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DON
>
8576
>
2300 - Underground Storage Tank Program
>
PR0231079
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 3:45:52 PM
Creation date
11/4/2018 3:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231079
PE
2381
FACILITY_ID
FA0003873
FACILITY_NAME
STOCKTON CITY MUNIC UTILITY
STREET_NUMBER
8576
STREET_NAME
DON
STREET_TYPE
AVE
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
8576 DON AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DON\8576\PR0231079\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HELMICK & LERNER INC. <br /> SITE SPECIFIC SAFETY PLAN <br /> INTRODUCTION <br /> This document describes the health and safety procedures for the activities planned in <br /> performing a preliminary site investigation at Don Ave Pump Stati on . All personnel <br /> and subcontractors will follow this plan. The prime responsibility for employee safety lies <br /> with each company that is involved in the work for it's own employees. It is expressly <br /> intended that all project work will comply with applicable sections of the California <br /> Occupational Health and Safety Code. All parties working on this project will maintain a <br /> general responsibility to identify and correct any health and safety hazards and are <br /> responsible for working in a safe manner. <br /> KEY PERSONNEL <br /> Project personnel who will have overall responsibility for the safe operation of this are: <br /> Site Contact: J. Brian Goins <br /> Project Manager and <br /> Site Safety Officer <br /> J. Brian Goins <br /> HELMICK & LERNER INC.: <br /> 3750 Auburn Boulevard, Suite A <br /> Sacramento, California 95821 <br /> (916)485-7222 <br /> PROJECT MANAGER AND SAFETY OFFICER RESPONSIBILITIES: <br /> * To conduct initial site safety training for all project field team members as <br /> described on this document, <br /> * To assure all field team personnel have read and understand the Health and Safety <br /> Plan, <br /> * To assure that all work performed on this project is conducted in a safe manner, <br /> * To coordinate with field personnel fire-watch, traffic control and site security, <br />
The URL can be used to link to this page
Your browser does not support the video tag.