Laserfiche WebLink
HELMICK & LERNER INC. <br /> SITE SPECIFIC SAFETY PLAN <br /> INTRODUCTION <br /> This document describes the health and safety procedures for the activities planned in <br /> performing a preliminary site investigation at Don Ave Pump Stati on . All personnel <br /> and subcontractors will follow this plan. The prime responsibility for employee safety lies <br /> with each company that is involved in the work for it's own employees. It is expressly <br /> intended that all project work will comply with applicable sections of the California <br /> Occupational Health and Safety Code. All parties working on this project will maintain a <br /> general responsibility to identify and correct any health and safety hazards and are <br /> responsible for working in a safe manner. <br /> KEY PERSONNEL <br /> Project personnel who will have overall responsibility for the safe operation of this are: <br /> Site Contact: J. Brian Goins <br /> Project Manager and <br /> Site Safety Officer <br /> J. Brian Goins <br /> HELMICK & LERNER INC.: <br /> 3750 Auburn Boulevard, Suite A <br /> Sacramento, California 95821 <br /> (916)485-7222 <br /> PROJECT MANAGER AND SAFETY OFFICER RESPONSIBILITIES: <br /> * To conduct initial site safety training for all project field team members as <br /> described on this document, <br /> * To assure all field team personnel have read and understand the Health and Safety <br /> Plan, <br /> * To assure that all work performed on this project is conducted in a safe manner, <br /> * To coordinate with field personnel fire-watch, traffic control and site security, <br />