My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DON
>
8576
>
2300 - Underground Storage Tank Program
>
PR0231079
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2019 3:45:52 PM
Creation date
11/4/2018 3:04:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231079
PE
2381
FACILITY_ID
FA0003873
FACILITY_NAME
STOCKTON CITY MUNIC UTILITY
STREET_NUMBER
8576
STREET_NAME
DON
STREET_TYPE
AVE
City
STOCKTON
Zip
95209
CURRENT_STATUS
02
SITE_LOCATION
8576 DON AVE
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DON\8576\PR0231079\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. All tanks and connecting lines shall be purged of the <br /> product and rinsate material. Rinsate material shall be <br /> handled as a hazardous waste: <br /> a) Requirement for dry ice use: <br /> 1) 15 lbs. per each 1,000 gallon capacity for diesel <br /> tanks. <br /> 2) 30 lbs. per each 1,000 gallon capacity for gasoline <br /> tanks. <br /> 6. Cap openings on all tanks before removing tanks from <br /> site: <br /> a) Nitrogen - tank must be capped to maintain nitrogen <br /> blanket. <br /> b) Carbon dioxide gas - tank must be capped to maintain <br /> gas blanket. <br /> c) The use of dry ice requires a vent hole for pressure <br /> relief. <br /> 1) Vent cap will have a 1/8 inch opening on top. <br /> 7. Empty underground tanks, if not properly cleaned, are <br /> considered hazardous waste. Requirements for handling <br /> are: <br /> a) Must be hauled to a certified hazardous waste site. <br /> b) Truck must be certified to haul hazardous waste. <br /> c) Must be able to present a hazardous waste manifest <br /> before leaving the site. <br /> S. Equipment to hoist tank must be rated for the calculated <br /> load: <br /> a) Equipment must not be strained. <br /> b) Tanks are not to be dragged. <br /> c) Load tank on carrier with pressure relief hole <br /> directed upward and all caps in place. <br /> NOT A <br /> THE JOB WILL BE HALTED IF ALL OF THESE ITEMS ARE NOT STRICTLY <br /> COMPLIED WITH. <br />
The URL can be used to link to this page
Your browser does not support the video tag.