My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1999-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:55:50 PM
Creation date
11/4/2018 3:09:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2006
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1999-2006.PDF
QuestysFileName
COMPLIANCE INFO 1999-2006
QuestysRecordDate
2/14/2018 7:25:41 PM
QuestysRecordID
3794706
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENHAIRM; VAPOR RECOVERY (EVR) <br />fn March of 2coo, the California Air Resources <br />Board adopted new, more stringent vapor recovery <br />requirements for Sa 'tine dispensing facilities. The <br />new progrgln is Oeo -fnnanced'dapor Recovery" <br />(EVR). EVR vias developed to promote enhanced <br />vapor recovery ;{ ' al reliability and to seek further <br />vator am'rxslon redu'Oi s to meet both California <br />old Federal Air 2uality Requirements. These new <br />compliance regoireiaents and certification proce- <br />dures fDc vapor racovery equipment constitute the <br />most stringent aild comprehensive performance <br />and reliability reQuirements in existence for Vapor <br />Recovery System's. Phase 1 EVR is now in force in <br />California. Additional EVR requirements including <br />those for Phase 2 vapor recovery equipment will <br />be phased in based on the timeline defined in the <br />regulatioFis (wvv,,v.arb-ca-gov/vapor/vaporhtm). <br />OutsVe of California VR, ccertain components of <br />EVR, arebeing ydopted o+ cu si•,'.ered in +nany areas. <br />Some itaf t nc rrtecir.irernents for a certified <br />mpori <br />MIR Phase 1 Systems indude: <br />• EVR System Certification Test Protocol — All <br />Phase t vapor recovery components must now <br />be instilled, tested, and certified as a complete <br />integral'PhaSe I System. <br />• EVR System Efficiency - must c v �* Aceed <br />98% vetsu; the 953/o previouslg required. <br />• EVR System Performance - allowable leak rates <br />for components such as spill container drain <br />valves,, overfill valves, and pressure vacuum <br />vents have Keen reduced by 50%. <br />• EVR System Reliability — Operating test period <br />for cerfificatilon of a complete system has been <br />increased tO a minimum of 180 days from the 90 <br />day individual component test period previously <br />required. Periodic follow-up testing of the vapor <br />recDwery seems and components at gasoline <br />dispensing systems is required. <br />EVR and its technology-forcing standards, <br />has raised tyle bar for petroleum equipment <br />manufacturers and for tank owners. OPW has 2 <br />responded to this challenge by focusing our <br />considerable resources on the task at hand. <br />The result i!o the completely integrated OPW <br />EVR Certified Phase I System designed, <br />manufactuGed, tested, and certified by the <br />indusrt}/s Fading manufacturer. Introducing the <br />OPW EVR •Cert fled Phase I System..... <br />0 <br />OPW 634TF-EVR DPW 1711T-EVF <br />PRODUCT FILL VAPOR RECOVERY <br />nncT rAP DUST CAP <br />© OPW 61SA-EVR Q OPW 61VSA-EVR <br />ROTATABLE SWIVEL ROTATABLE SWIVEL <br />ADAPTOR — FILL PORT ADAPTOR — VAPOR PORT <br />.. .11- cc1 ocl I ISA Patent No. 5,664,951 <br />
The URL can be used to link to this page
Your browser does not support the video tag.