Laserfiche WebLink
UNDERGRO• STORAGE TANK MOORING PLAN <br />For use by Unidocs Member Agencies or where rrpprowd by your Local Jurisdiction <br />Authority Cited: Title 23 CCR Sections 2632(d)(1), 2634(a)(2), and 2641(/1) <br />TYPE OF ACTION Eirl. NEW PLAN ❑ 2 CHANGE OF INFORMATION <br />NMI <br />PLAN TYPE ONITORING IS IDENTICAL FOR ALL LISTS AT THIS FACILITY. <br />^10� <br />(Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Ordy) — — <br />FACILITY NAMEZ9�11 <br />FACILITY SITE ADDRESS Man. <br />CITY Olr�To�I <br />ate. <br />H. EQUIPMENT TESTING AND PRE VENTIVE MAINTENANCE <br />State law requires that testing, preventive maintenance, and calibration of monioring equipment (e g.. sensors. Pow, line kali detectors, etc.) be performed in <br />^0 <br />accordance with the equipment manufacturers' instructions, "annually, ichever is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICEDANNUALLY ❑ 99. OTHER (Specify): <br />^m. <br />III. MONITORING LOCATIONS <br />This monitoring plan most include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed (i.e.. location of each seruor, <br />line leak detector, monitoring system control panel, etc.). ifym already have a diagram (e.g., current UST Monitoring Site Plan from a Monitoring System Certification <br />form, Hazardous Materials Business Plan map, etc.) which slows all required information. include it with this plan. <br />IV. TANK MONITORING <br />MONI RING IS PERFORMED USING THE FOLLOWING METHOD(S): (Check all that apply) <br />att°. <br />1. CONTINUOUS ELECTRONIC MONITORING OF ANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENTS 1S' &raDRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />Nil] <br />PANEL MANUFACTURER: VEF%�E ��Of ^112- MODEL #: <br />LEAK SENSOR MANUFACTURER: ^1M. MODEL #(S): 79 <br />MIs. <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(Sl <br />PANEL MANUFACTURER: MI6. MODEL #: <br />MIT <br />IN -TANK PROBE MANUFACTURER: ^Oe MODEL #(S): <br />MM <br />LEAK TEST FREQUENCY: ❑ a. CONTINUOUS ❑ IS. DAILY/NIGHTLY 0 a WEEKLY <br />^20. <br />❑ d. MONTHLY ❑ e. OTHER(Speciy). Mgr <br />PROGRAMMED TESTS: ❑ a. .1 h. ❑ b.0.2 h. ❑ c. OTHER (S IPa'fyE Mai. <br />0 &p� g�P� <br />MD. <br />3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 ❑ b. STATISTICAL PER 23 CCR §2646.1 <br />_ 9/ <br />M24 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />M3. <br />[]6 INTEGRITY TESTING PER 23 CCR <br />^§26/4}.1 <br />TEST FREQUENCY:/ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER(Speciy): <br />��,�� <br />@'&.VISUAL MONITORING DONE: W?< DAILY ❑ IS. WEEKLY pte .r<�.y> .,A) <br />❑ 99. OTHER (Specify): <br />^� <br />V. PIPE MONITORING <br />MON TORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />^Oo <br />CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(FS) AND OTHER SECONDARY CONTAINMENT <br />SECONDARY CONTAINMENT IS: ❑ a. DRY ❑ IS, LIQUID FILLED ❑ c. UNDER PRESSURE, ❑ d UNDER VACWM <br />^ul. <br />PANEL MANUFACTURER:yE��L�P,ep � ^OZ MODEL #: //_ -S �• . r7 C� <br />^O1 <br />LEAK SENSOR MANUFACTURER: M" MODEL#(S): ;79,A1490 --Wil <br />^Os' <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (ke., TURBINE) SHUTDOWN? ❑ a. YES ❑ b. NO <br />Mab <br />WILL FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />^02 <br />5r2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED <br />MLLD MANUFACTURER(s): AU' MODEL #(S): <br />^u' <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS <br />ELLD MANUFACTURER: y�EDE,c' .fl9r�J�" ^N0 MODEL#: %L.S — .rte <br />wl. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 02 g.p.h. ❑ IS. MINIMUM ANNUAL 0.1 g.p.h. <br />^H' -- <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b. NO <br />^Ue, <br />WILL ELLD FAILURFIDISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a. YES ❑ b. NO <br />sw_ <br />Q'4. INTEGRITY TESTING <br />FREQUENCY: ��/ANNUALLY ❑ b. EVERY YEARS [I c. OTHER(Speciy) ^Ms- <br />❑ b.WEEKLYe ❑ TIME SYSTEM OPERATED— <br />M� <br />LY!'TEST <br />VIS C. MIN. MONTHLY& EACH Mn <br />S.UAL MONITORING DONE: a. DAILY <br />•Requrts asx •iPaq ••Allowdfarmmiuriegdmaurid wvgmay eanfo.fid PWKantY D°RSC 4'-SUI.NaMI) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(ax3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING 1S CONNECTED TO THE UST(s) <br />❑ 99.OTHER (Speciy) <br />Mn <br />UN -022A -1/5 www.unidocs.org Rev. 10/14/03 <br />