Laserfiche WebLink
Underground Storage Tank MonitoTng Plan —Page 2 of <br />IN -022A - 3/5 www.unidoes.ore <br />Rev. 10/I4/03 <br />VL DISPENSER MONITORING <br />M�O/yI1TORING OF AREAS BENEATH DISPENSER(S) IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) Wso. <br />LM I. CONTINUOUS ELECTRONIC MONITORING OE UNDER DDIISPENSER CONTAINMENT (UDC) <br />PANEL MANUFACTURER: Y�E/JE C,p �C(X%nut. MODEL JI: 72,15'-350 w+ <br />T <br />LEAK SENSOR MANUFACTURER: atss. MODEL JJ(S): atv. <br />WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? f� YES F01 b. NO nus. <br />�a <br />WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? pl'a. ES ❑ b. NO ntw <br />WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a. YES ❑ b. NO Mn. <br />❑ 2. MECHANICAL ASSEMBLY (e.g., FLOAT AND CHAIN ASSEMBLY) IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br />�� ASSEMBLY MANUFACTURER: nut MODEL A(S): hn9. <br />pd'3.VISUAL MONITORING DONE: ❑ a. DAILY.WEEKLY <p.�:mg. yapp,.,yJ nno <br />❑ 4. NO DISPENSERS <br />❑ W. OTHER (Specify) <br />ai61 <br />VII. ENHANCED LEAK DETECTION <br />❑ I. WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THATWEMUSTIMPLEMENTENHANCED <br />LEAK n}10 <br />DETECTION (ELD) FOR THE UST(S) COVERED BY THIS PLAN. PER 23 CCR §2644.1, ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br />VIII. TRAINING <br />REFE CE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />1. HIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) a� <br />2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />3. THE <br />FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1, 2005) <br />V_1 <br />4. ALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />5. �' CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />INVENTORY RECONCILIATION" <br />,,STATISTICAL <br />7.SWRCB PUBLICATION "WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br />99. ❑ <br />OTHER(Specify): <br />AM <br />Personnel with UST monitoring responsibilities are familiar with all ofthe above documents relevant to theirjob duties and can access those documents when needed. <br />By January 1. 2005, this facility will have a "Designated UST Operator" has <br />who passed the Califomia UST Sylem Operator Exam administered by the International <br />Code Council (ICC). By July I, 2005, and annually thereafter, the "Designated UST Operator" will Vain facility employees in the proper operation and maintenance <br />of the UST systems. This training will include, but is not limited m, the following: <br />Operation of the UST systems in a manner consistent with the facility's best management practices. - <br />�- The facility employee's role with regard to the leak detection equipmemL <br />The facility employee's role with regard to spills and overfills. <br />> Whom to contact for emergencies and leak detection alarms. <br />For facility employees hired on or after July I, 2005, the initial training will be conducted within 30 days of the date of hire. <br />IX. COMMENTS/ADDTTIONAL INFORMATION <br />Please use this section la include any additional UST systemmonitoring-related information (e.g., additional information required by your local agenq): nus. <br />Note regarding Section X. Pending certification of a Designated UST Operator, the following <br />person has authority for performing the monitoring <br />activities and maintaining leak detection equipment covered by this plan. NAME: <br />JOB TITLE: <br />X. PERSONNEL RESPONSIBILITIES <br />AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br />APPLICATION —FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING <br />THE MONITORING ACTIVITIES AND MAINTAINING <br />LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN, AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br />OF THE FACILITY'S UST SYSTEMS IN ACCORDANCE WITH 23 CCR § 2715(b). <br />XI. OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: 1 certify that the information provided herein is true and accurate to the best of my knowledge. <br />O RATOR SI REPRESENTING DATE: Nvt <br />❑ Owner sue. <br />❑ Operator d 21 <br />O R/OPERATOR NAM Mv' <br />OWNER/OPERATOR TITLE: nws. <br />(Agency Use Only) This plan has been reviewed and: ❑ Approved ❑ Approved With Conditions ❑ Disapproved <br />Local Agency Signature: <br />Date: <br />Commenrs/Special Conditions: <br />IN -022A - 3/5 www.unidoes.ore <br />Rev. 10/I4/03 <br />