My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 1999-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/6/2023 12:55:50 PM
Creation date
11/4/2018 3:09:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2006
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 1999-2006.PDF
QuestysFileName
COMPLIANCE INFO 1999-2006
QuestysRecordDate
2/14/2018 7:25:41 PM
QuestysRecordID
3794706
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK RESP NSE PLAN <br />For use by Undoes Member Agencies or where approved by your Local Jurisdiction <br />Authority Cited: Title 23 CCR, Sections 2632(d)(2). 2634(¢), and 2641(h) tone form cer facility) <br />Rol <br />TYPE OF ACTION - NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />I. FACILITY INFORMATION <br />FACILI'FYID=(dgelm'Use Ontt/ 9f`7 3 Ro+ <br />FACILIITpTY NAME <br />Z(J%%r Rot. <br />aoa CITY <br />F.ACILITI' SITE ADDRESS <br />oGAC art% <br />� <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST n•stems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan. if neccssa y <br />If safe to do so, facility personnel will take immediate measures to control or stop any rJease (e.g., activate pump shutoff; etc.) ante, ry, sslJ remove <br />remaining hazardous material from the UST system. <br />i Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />Recovered hazardous materials, unless still suitable <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. <br />for their intended use, will be managed as hazardous waste. <br />will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br />i Absorbent material <br />to be elfeetwe. It will then be managed properly. Used absorbent material• reusable or waste, will be stored in a properly labeled and sealed container. <br />from secondary containment systems, or from clean-up activity• has been in contact with any <br />Facility personnel will determine whether or not any water removed <br />hazardous material. If the water is conmminated. it will be managed as hazardous waste. If the water has a petroleum sheen (i.e., rainbow• colors), it is <br />non -hazardous) from sumps• spill containers, ete. <br />contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water (hazardous or <br />will not be disposed to storm water systems. <br />We rewiew Secondary containment systems for possible deterioration if any of the following conditions occur: <br />will <br />I. Hazardous material in contact with secondary containment is not compatible with the material used for secondary con immeW <br />is to damage from any equipment used to remove or dean up hazardous material collected in secondary containment: <br />2. Secondary containment prone <br />3. Hazardous material, other than the product(wasle stored in the primary containment system, is placed imide secondary containment to treat or netllralim <br />released product/waste. and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC ?L\l.\TF.N:\NCE: Spill control and clean-up equipment kept Peloolocudy on-site is listed in the facility's Hazardous Materials Business Plan. This <br />each use, and supplies are replenished as needed. Defective equipment is repaired or replaced u necessary. <br />equipment is inspected at [east monthly, and atter <br />EQUIPMENT NOT PERMANENTLY ONSITE. BUT AVAILABLE FOR USE IF NEEDED: (Com tete onl ifa licable) <br />EQUIPMENT LOCATION AVAILABILITY <br />wo <br />ta_+o, <br />ml. <br />R1l1l . Fall <br />R 3+ <br />RI+ <br />R1 <br />all <br />11,13 <br />R t <br />RN. <br />RN_ <br />R55 <br />RIS. <br />R25, <br />IV. RESPONSIBLE PERSONS <br />THE FOLLONIING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: me <br />NAME RJO <br />TTTLE <br />Rst <br />a+t. <br />NAME <br />TrrLE <br />it�y�� <br />NAJIE/)U <br />TITLE/7 / RD. <br />R+s <br />NAME <br />TITLE <br />V. INDIRECT HAZARD DETERMINATION <br />This information is required only when the presence of the hazardous substance can not be dMennined directly by the monitoring method used (e.g.. wvhem liquid level <br />measurements in a tank annular space or secondary piping are used as the basis for leak determination). <br />THE FOLLOWING STEPS WILL BE TAKEN TO DETERMINE THE PRESENCE OR ABSENCE OF HAZARDOUS SUBSTANCE IN THE SECONDARY <br />CONTAINMENT IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE: Rha <br />u-., tnnemi <br />UN -02211- 113 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.