Laserfiche WebLink
SWACB, January 2002 <br />SECONDARY P11 <br />Test MethodDeveloped By: <br />Test Method Used: <br />0 <br />LING <br />0 Piping Manufacturer <br />0 Other (Specify) <br />�essure <br />n tither <br />i� indust �Standard <br />C Vacuum <br />Page _ of <br />11 Professional Engineer <br />Hydrostatic <br />Test Eympmem used: <br />. .. .. ... <br />—F�quipment <br />Resolution ution: <br />A <br />Piping Run# <br />Piping Run <br />Piping Run # Piping <br />Piping Material: <br />Run # <br />Piping Manufacturer: <br />I Pining Diameter; <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />i in -run isolation: <br />Mj <br />Wait time between applying <br />-j <br />pressure/vacuum/water and <br />starting test: <br />Test Start Time: <br />Initial Reading (Rj): <br />J1 ji <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />'i I , <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result -7. <br />ass 11 F-0 <br />"ss ailrass <br />n Fail oiai, <br />Comments – (inchide information on repairs made prior to testing, and recommendedfollow-ip forfailed tests) <br />