Laserfiche WebLink
S WRCB, January 2002 • • <br />Page _ of <br />Fest Method Developed By: ❑Sump Manufacturer <br />atanaara a Professional Engineer <br />L, utner (opecijjy <br />iTest Method Used: ^ Pressure ❑ Vacuum - ydrostatic <br />❑ Other (Spect6) <br />Test Equipment Used t— <br />E <br />--- --------------_ <br />Equipment Resolution: <br />:= r. <br />iA}ii5 4eYv'it:lr <br />Sump # <br />Sump # �x <br />I Sump <br /># <br />Sump # <br />Sump Diameter: <br />z,/ <br />Sump Depth: <br />Sump Material: <br />r -. <br />Height from Tank Top to Top of <br />Highest Pi in Penetration: <br />/r <br />Height from Tank Top to Lowest <br />Electrical <br />Penetration: <br />Condition of sump prior to testing: <br />r 1, <br />Portion of Sump Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />= Yes ❑ No A <br />G Yes ❑ No &<A <br />G Yes ❑ No A <br />❑ Yes ❑ No ❑ NA <br />product and water)?' <br />Turbine shutdown response time <br />Is system programmed for fail-safe <br />shutdown?' <br />Yes ❑ No A <br />❑ Yes ❑ No A <br />❑ Yes E No - . A <br />G Yes ❑ NTo ❑ NA <br />Was fail-safe verified to be <br />o erational? <br />L Yes ❑ No A <br />G Yes ❑ No A <br />❑ Yes D No P<k <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuurrwater and starting <br />test: •V <br />/t%/ <br />Test Start Time: <br />y l <br />Initial Reading (Rt):. <br />Test End Time: <br />V © <br />i/i y `7' s- <br />V <br />Final Reading (RF): <br />�- <br />Test Duration: <br />Change in Reading (RF -Rt): <br />(� <br />Pas Fail Threshold or Criteria: <br />3 . /� (, <br />��y tj r <br />�� <br />Test Result:-- <br />ass ❑Fail <br />ass ❑Fail <br />ass ❑Fail <br />❑Pass G Fail <br />Was sensor removed for testing? <br />- es ❑ No = NA <br />es G No 7 NA <br />es ❑ No -- NA <br />G Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verifiedfunctionalaRertestinQ? <br />_ <br />❑No _NA <br />� -� <br />ItsYes NA <br />❑No D <br />� �� <br />le -yes ❑No _-NA <br />❑Yes 0 N ❑NA <br />— <br />Comments - (include information on repairs made prior to testing and recommended follow up forfailed tests) <br />' If the ertire depth of the sump is not tested, specify how much was tested. If the answer to anv of the questions indicated with:an <br />asteris!: (") is "NO" or `NA", the entire sump must be tested. (See SbbRCB LG -160) <br />