My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
508
>
2300 - Underground Storage Tank Program
>
PR0231057
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:12 PM
Creation date
11/4/2018 3:09:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231057
PE
2361
FACILITY_ID
FA0003720
FACILITY_NAME
CHARTER WAY PETRO INC.
STREET_NUMBER
508
Direction
W
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
16504016
CURRENT_STATUS
01
SITE_LOCATION
508 W DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\508\PR0231057\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
2/15/2018 12:34:40 AM
QuestysRecordID
3795241
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 ompr <br /> 5. SECONDARY PIPE TESTING <br /> FT7estMethMo' <br /> Developed By: Piping Manufacturer 0 Industry Standard Professional Engineer <br /> Other(Specify) <br /> ethod Used: 0 Pressure Vacuum -Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 4-30 psi <br /> Reg Piping Run # 1 Prem Piping Run #2 Diesel Piping Run # 3 Piping Run # <br /> Piping Material: FG FG FG <br /> Piping Manufacturer: U K U K U K <br /> Piping Diameter. 3" 3" 3" <br /> Length of Piping Run: 75' 75' 75' <br /> Product Stored: Gas Gas Diesel <br /> Method and location of piping- Sump Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressurelvacuumlwater and 5 min 5 min 5 m i n <br /> starting test: <br /> Test Start Time: 10:10 10:10 <br /> Initial Reading(R): 5 psi 5 psi <br /> Test End Time: 11:10 11:10 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result: F101 Pass ❑ Fail © Pass ❑ Fail ❑ Pass tom+ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.