Laserfiche WebLink
Page 3 of 8 ompr <br /> 5. SECONDARY PIPE TESTING <br /> FT7estMethMo' <br /> Developed By: Piping Manufacturer 0 Industry Standard Professional Engineer <br /> Other(Specify) <br /> ethod Used: 0 Pressure Vacuum -Hydrostatic <br /> Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 4-30 psi <br /> Reg Piping Run # 1 Prem Piping Run #2 Diesel Piping Run # 3 Piping Run # <br /> Piping Material: FG FG FG <br /> Piping Manufacturer: U K U K U K <br /> Piping Diameter. 3" 3" 3" <br /> Length of Piping Run: 75' 75' 75' <br /> Product Stored: Gas Gas Diesel <br /> Method and location of piping- Sump Sump Sump <br /> run isolation: <br /> Wait time between applying <br /> pressurelvacuumlwater and 5 min 5 min 5 m i n <br /> starting test: <br /> Test Start Time: 10:10 10:10 <br /> Initial Reading(R): 5 psi 5 psi <br /> Test End Time: 11:10 11:10 <br /> Final Reading(RF): 5 psi 5 psi <br /> Test Duration: 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 <br /> Test Result: F101 Pass ❑ Fail © Pass ❑ Fail ❑ Pass tom+ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />