Laserfiche WebLink
Monitoring System Certification �OC <br /> F. In-Tank Gauging I SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com let e the folio in checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> EE] Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ No* Was accuracy of system water level readings tested? <br /> ❑ No* Were all probes reinstalled properly? <br /> ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com Tete the followin checklist: <br /> M Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 10 3 g.p.h.; ❑0.1 g.p.h; ❑ 0.2 g.p.h. <br /> 0 Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> r ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 0 NIA <br /> ® No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N1A <br /> ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ N1A or disconnected? <br /> ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ NIA malfunctions or fails a test? <br /> x❑ Yes 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> 0 Yes I ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will he corrected. <br /> H. Comments: <br /> IJN-036-314 Nage 3 of 4 Rev.06/04101 <br /> wwwmni(Iom org <br />