Laserfiche WebLink
and <br /> d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> 7. Contact Ray von Flue (4689848)to arrange the following inspections(a 48-hour notice <br /> is required): <br /> a. Verify corrosion protection on the fill risers before back filling. <br /> b. A third party line tightness test(or equivalent) must be performed on the diesel <br /> product line once repairs have been made. <br /> c. Verify that the float and chain for the diesel compartment for dispenser#112 <br /> functions normally when tested with water. <br /> d. One-hour hydrostatic test(or equivalent)on the Diesel, 91 and 87 spill buckets. <br /> e. Verify five-gallon capacity, corrosion protection and drain valve operation for <br /> the Diesel, 91 and 87 spill buckets. <br /> f. Verify 95%shutoff on the Diesel, 91 and 87 drop tubes with mechanical flappers <br /> (if applicable). <br /> 8. A"Certificate of Compliance for Underground Storage Tank Installation Form C" shall <br /> be submitted by the owner or the owners'agent [pursuant to (CCR)2635(d)]before this <br /> upgrade will be considered complete by EHD. <br /> 9. Permit expires January 30 2008. <br /> Ray von Fl%ie,RENS <br /> Senior Registered Environmental Health Specialist <br />