Monitoring system <br /> • We plan to relocate the Veeder Root TLS 350 from its current location to the east side of the new <br /> building in the new office area <br /> • As an interim measure, we plan to maintain tank monitoring during our underground conduit <br /> relocation by connecting the existing annular monitoring sensors to temporary above ground cables in <br /> pvc conduit <br /> • We will schedule an inspection with you to verify the proper monitoring system operation after this <br /> interim wiring method <br /> • We will then relocate (from their current location at the building front door) the conduits to the <br /> just outside the new office area and install new monitoring cables Please see item 2 on map 2 - <br /> attached <br /> • If needed, we will remove concrete at the annular/tank gauge manhole areas over the tanks to allow <br /> for conduit connections <br /> • Then we will relocate the Veeder Root TLS 350 console, connect the new cables, and connect <br /> temporary power <br /> • We will then have a scheduled inspection by you to confirm proper monitoring system operation <br /> • After the ISD components have been installed we will cold start the TLS and schedule an inspection <br /> with you immediately (same day) to again verify proper monitoring system operation <br /> Miscellaneous <br /> • Finish the connection of the gasoline vent risers to the existing Healy CAS tank <br /> • After dispenser start up we will purge the product lines of air at the impact valves <br /> • Calibrate the dispensers <br /> • Provide for third party post upgrade complete system vapor recovery testing as prescribed by the San <br /> Joaquin Valley Air Pollution Control District <br /> • Provide for tank annular space testing (if needed) (see bullet#5 in Monitoring system above) <br /> • We will remove about 10 feet of concrete at the new store building entrance to relocate the fueling <br /> system conduits <br /> There is the possibility that we might need to remove concrete at several areas over the tanks to re-work the <br /> monitoring system conduits to allow for new conductors to be installed. These areas are at the middle of the <br /> tanks and at the annular riser ends of the tanks and at least 10 feet from the piping sumps and piping runs. If <br /> this is done will have the annulars tested by Afforda Test. <br /> The necessary contractor certifications and maps are attached. <br /> Thank you, <br /> Mark Vendeiro <br /> MVP Petroleum Engineering, Inc. <br />