Laserfiche WebLink
S W RCB:January 2002 • • Page_of <br /> 5. SECONDARY PIPE TESTING <br /> LEquipment <br /> loped By: Piping Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> : Pressure ❑Vacuum ❑ Hydrostatic <br /> ❑Other(Specify) <br /> sed: .__ Equipment Resolution: <br /> Piping Run 11Piping Run# Piping Run# Piping Rim # <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: -I <br /> Method and location of -- <br /> piping-run isolation: <br /> Wait time between applying <br /> -- — <br /> pressure and starting test: <br /> Test Start Time: '— <br /> Initial Reading(Rj): - <br /> Test End Time: - <br /> Final Reading(RF): — <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: Pass ❑ Fail Pass D Fail Pass ❑ Fail Pass Fail <br /> Comments—(include information on repairs made prior to testing, and recommended ollow up or jailed tests) <br /> Not Tested with this event! <br />