My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DR MARTIN LUTHER KING JR
>
749
>
2300 - Underground Storage Tank Program
>
PR0231060
>
COMPLIANCE INFO 2007-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:39:10 PM
Creation date
11/4/2018 3:20:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2012
RECORD_ID
PR0231060
PE
2361
FACILITY_ID
FA0003870
FACILITY_NAME
SRH FOOD & GAS
STREET_NUMBER
749
Direction
E
STREET_NAME
DR MARTIN LUTHER KING JR
STREET_TYPE
BLVD
City
STOCKTON
Zip
95206
APN
14734309
CURRENT_STATUS
01
SITE_LOCATION
749 E DR MARTIN LUTHER KING JR BLVD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DR MARTIN LUTHER KING JR\749\PR0231060\COMPLIANCE INFO 2007-2012.PDF
QuestysFileName
COMPLIANCE INFO 2007-2012
QuestysRecordDate
3/29/2018 3:42:52 PM
QuestysRecordID
3839705
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 • • Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer D Industry Standard Professional Engineer <br /> D Other (Specr•'fy) - -- <br /> Test Method Used: D Pressure D Vacuum Hydrostatic <br /> D Other (Specih') - -- <br /> Test Equipment Used: Equipment Resolution: <br /> Sump#SumpSump# Sump# <br /> gl <br /> Sump Diameter: — - <br /> Sump Depth: -- <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 4 <br /> Condition of sump prior to testing: -- <br /> Portion of Sump Tested' -- <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes DNo DNA Yes DNo DNA Yes DNo DNA Yes DNo DNA <br /> product and water)? —-' <br /> Turbine shutdown response time — <br /> Issystemprogrammedforfail-safe Yes DNo DNA Yes DNo DNA Yes DNo DNA Yes DNo DNA <br /> shutdown? - I' <br /> Was fail-safe verified to be Yes No DNA Yes No DNA Yes No DNA D Yes No DNA Ili <br /> operational? <br /> Wait time between applying water <br /> and starting test: - <br /> Test Start Time: <br /> i <br /> Initial Reading(Ri): - <br /> Test End Time: — <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): — <br /> Pass/Fail Threshold or Criteria: ----! <br /> Test Result: Pass D Fail Pass ❑ Fail Pass ❑Fail Pass D Fail <br /> Was sensor removed for testing? Yes D No D NA Yes DNo DNA Yes DNo DNA- Yes DNo -jNA <br /> Was sensor properly replaced and Yes DNo DNA Yes DNo DNA Yes G No ❑NA Yes ❑No DNA <br /> verified functional after testin ? - <br /> Comments (include information on repairs made prior to testing and recommended follow-up far failed tests) <br /> Not Tested with this event! <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to�ny of the questions indicated with an <br /> asterisk(") is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.