Laserfiche WebLink
SWRCB,January 2002 • • Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: D Sump Manufacturer D Industry Standard Professional Engineer <br /> D Other (Specr•'fy) - -- <br /> Test Method Used: D Pressure D Vacuum Hydrostatic <br /> D Other (Specih') - -- <br /> Test Equipment Used: Equipment Resolution: <br /> Sump#SumpSump# Sump# <br /> gl <br /> Sump Diameter: — - <br /> Sump Depth: -- <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Hi hest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 4 <br /> Condition of sump prior to testing: -- <br /> Portion of Sump Tested' -- <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes DNo DNA Yes DNo DNA Yes DNo DNA Yes DNo DNA <br /> product and water)? —-' <br /> Turbine shutdown response time — <br /> Issystemprogrammedforfail-safe Yes DNo DNA Yes DNo DNA Yes DNo DNA Yes DNo DNA <br /> shutdown? - I' <br /> Was fail-safe verified to be Yes No DNA Yes No DNA Yes No DNA D Yes No DNA Ili <br /> operational? <br /> Wait time between applying water <br /> and starting test: - <br /> Test Start Time: <br /> i <br /> Initial Reading(Ri): - <br /> Test End Time: — <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): — <br /> Pass/Fail Threshold or Criteria: ----! <br /> Test Result: Pass D Fail Pass ❑ Fail Pass ❑Fail Pass D Fail <br /> Was sensor removed for testing? Yes D No D NA Yes DNo DNA Yes DNo DNA- Yes DNo -jNA <br /> Was sensor properly replaced and Yes DNo DNA Yes DNo DNA Yes G No ❑NA Yes ❑No DNA <br /> verified functional after testin ? - <br /> Comments (include information on repairs made prior to testing and recommended follow-up far failed tests) <br /> Not Tested with this event! <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to�ny of the questions indicated with an <br /> asterisk(") is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />