Laserfiche WebLink
f , <br /> IVI� 9. Submit a complete third-party evaluation of the lining material and procedures as follows: <br /> ^a. A resume, including all applicable formal training experience, from personnel who conducted the <br /> evaluation (not necessary for Underwriters Laboratories). <br /> ,b. An affidavit from the company that received the third party evaluation confirming that there are <br /> no mutual financial interests between lining company and testing organization (not necessary for <br /> Underwriters Laboratories) <br /> �c. A description of the testing organization's formal periodic inspections of the listed/certified <br /> materials and processes. (The purpose of the formal periodic inspections is to ensure that the <br /> listed/certified materials and process continue to comply with the lining/certification.) <br /> �d. A copy of the voluntary consensus standard that was used during the evaluation or description <br /> Iof the equivalent test protocol, if a voluntary consensus standard was not used. <br /> w <br /> �e. The testing organization's raw field data. laboratory results, calculation, graphs, charts, etc. <br /> �f. The conclusion of the testing organization's evaluation of the lining material. <br /> ^g. The conclusion of the testing organization's evaluation of the lining process. <br /> I <br /> t <br /> _h. Limitations on the listing/certification, if any, <br /> J. A statement from the testing organization confirming that ail equipment at the test site(s) was <br /> properly maintained and calibrated to the level of accuracy necessary for a valid evaluation. <br /> f <br /> J. A statement from the lining applicator confirming that the materials that will be used are the <br /> same materials that were evaluated by the testing organization. <br /> �k. A statement from the lining applicator confirming that the processes that will be used are the <br /> same processes that were evaluated by the testing organization. <br /> �l. A description of tank lining processes to be used by the applicator. <br /> _m. A statement from the company that received the evaluation describing training provided to the <br /> i authorized applicator. <br /> 10. Which of the following unexpired contractors licenses does the lining applicator have: (Please submit a <br /> copy of the license to PHS-EHD) <br /> General Engineering Contractor (A) <br /> w Limited Specialty/Service Station Maintenance (C-61/D40) <br /> Limited Specialty/Synthetic Products (C-61/012) <br /> j Limited Specialty/Protective Ccatirg (C-51/D51) <br /> i <br /> Painting anc Decorating (C-33) <br /> 11. Is the special inspector a registered prcfessicnal engineers_Yes_ne <br /> 12. Holes and splits in steei tanks, if any, will be plugged with self-tapping bolts, bciler Plugs, water- <br /> tight, hydrauiic cement, or welding. <br />