Laserfiche WebLink
OP/ 13 Striker plates will be installed beneath all tank © e <br /> dipsticking, P Wings that could be used for manual <br /> 14. Lining will be applied within 8 hours of sandblasting, <br /> 15- Certification by coatings expert or special inspector that the tank was lined properly,. <br /> a. Steel or clad Usrs <br /> — visual check of lining <br /> thickness test of lining <br /> hardness test of lining <br /> electrical resistance holiday detector test <br /> ____ vacuum test <br /> b. Fiberglass US7s <br /> visual check of lining <br /> thickness test of lining <br /> hardness test of lining <br /> 16. <br /> vacuum test (not required if submerged by 50% of depth in ground water) <br /> if a coatings expert was used, is he financially independent from the <br /> company? yes no tank owner and lining <br /> d <br /> I 17. k integrity ri <br /> j 9 ty test will be conducted. <br /> Y 18. A guideline has been submitted by the lining company <br /> conducting a Feld inspection of the tank lining. P Y for local agency inspectors to use <br /> when <br />