Laserfiche WebLink
Monitoring System Certification . <br /> Site Address: 3633 DUCK CREEK DRIVE Date of Testing/Service: 1013112001 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 119,02 <br /> Complete the following checklist: <br /> j 71 Yes F Na• Is the audible alarm operational? <br /> ..:::::...................::::............................._............-.........................................._........------.._............---....._.._..,._....,........................................................................... <br /> ® Yes F-]No' Is the visual alarm operational? <br /> ..........................-_...............................................,................._...-.._...._..------.._..............................__.........---........................._._... ............._...---.........._--- ..........................._...._.-......... _..m._.__........_..._...._ ........................... <br /> Yes t_,]No Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> € Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> €® Yes ❑No` interfere with their proper operation? <br /> ...._-.. ....... ,,_._.__ ..........--------..................................... ..- <br /> ,........... -..._..... ... <br /> ._......_........ ..............------............._..........................................................._.._ .._............................................................................................ <br /> .............__._...... . <br /> Yes No N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> Yes ®No' N/A monitoring system detects a leak„fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ^" Sump/Trench Sensors; Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes No <br /> .....__. ..... ... ... ..........._.. <br /> _................................._._..... ..__-------.... .............. ..............._.. ..:........---------.........,----------.,,,,................................................. ............ _... :..................._............ <br /> tt�-�--tI Yes �--t No• nNiA Far.. tank. .., ._ . <br /> syste.ms that..........uti.,.;.;.lize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> 1.....i 1.....1 l.._J overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill paints(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> Yes' No Was any monitoring equipment replaced?If yes, identify specific sensors, probes,or other equipment replaced and list the <br /> i manufacturer name and model for all replacement parts in Section E, below. <br /> Yes` No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) Product; <br /> Water. If yes,describe causes in Section E, below. <br /> ' Yes )No Was monitoring system set-up reviewed to ensure proper settings?Attach setup reports if applicable; <br /> ......................_.._.--------------------_...,....---..............4...... .... ..,,...........p <br /> ........ ............ _.,...... P. <br /> Yes No Is all monitoring <br /> equipment <br /> qui mento operational per manufacturers'specifications? <br /> `In Section E below, describe how and when these deficiences were or will be corrected. <br /> E. Comments; <br /> NEW OIL HAS PROBUCT IN SUMP <br /> DIE RES ANNULER HAS .5 INCH WATER <br /> page 2 of 3 <br />