Laserfiche WebLink
Oonitoring System Certification <br /> Site Address: 3633 DUCK CREEK DRIVE Date of Test!nglService: 40/31/2001 <br /> F. In-Tank Gauging 1 SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> rr Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> �Yes No" Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 'X Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> l Yes No• Was accuracy of system product level readings tested? <br /> Yes No•' Was accuracy of system water level readings tested? s <br /> ._ <br /> Yes 1.7 No•; Were all probes reinstalled properly? I <br /> .......�...............................;......................................................................................................._..................... <br /> .............................................................................. <br /> Yes No Were all items on the equipment manufacturers maintenance checklist completed? <br /> " In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : Check this box if LLDs are not Installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Yes No' N1A`Check all that apply)Simulated leak rate: 3 g.p.h D.t g.p.h C]0.2 g.p.h <br /> Yes <br /> No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes No ;Was the testing apparatus properly calibrated? <br /> Yes No N/A For mechanical Lli does the LLD restrict product flow if it detects a leak? <br /> YesN6• NIAI For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Yes No• [7,NIA For electronic Li does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> Yes `x.�No' . . NIA;For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> Yes No N!A For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> yes • 's Were all items on the equipment manufacturers'maintenance checklist completed? <br /> "In the Section H,beYow,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 w <br />