Laserfiche WebLink
From:Bern Steiner To.Mr.Steve Sasson Date.01/18/2001 Time:7:08:52 PM Page 5 of 6 <br /> 10 0 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> 8990 SHOAL CREEK,13Uil-DiNG 200 <br /> TEST DATE: 12/21/00 AUSTIN,TEXAS 78757(512)451-6334 WORK ORDER NUMBER: 221807 <br /> CLIENT: RYDER TRUCK RENTAL, SITE: RYDER 1071A <br /> TANK INFORMATION <br /> Tank ID: 1/MAIN 1 Tank manifolded: YES Bottom to top fill in inches: lea.a <br /> Product: DIESEL Vent manifolded: YES Bottom to grade in inches: <br /> Capacity in gallons: 12,110 Vapor recovery manifolded: NO Fill pipe length in inches: 72.8 <br /> Diameter in inches: 96.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 391 Overspill protection: YES Stage I vapor recovery; NONE <br /> Material; DW STEEL Installed: ATG Stage II vapor recovery: NONE <br /> CP installed on: <br /> COMMENTS <br /> TANK TEST RESULTS Test Method' LEAK DETECTOR TEST RESULTS Test method: <br /> PSI at tank bottom: Newipassed Failed/replaced New/passed Failed/replaced <br /> Fluid level in inches: L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> UFT/OFT: Make: RED JAc= RED JACKET <br /> Fluid volume in gallons: Model: Fx2-Dv FX1D <br /> Tank water level In Inches: S/ill: 102997997 301903343 <br /> Test time: NOT Open time in sec: 2.00 <br /> Number of thermisters; TESTED Holding psi: 29 NOT <br /> Specific gravity: Resiliency cc; 400 TESTED <br /> Water table depth in inches: lTest leak rate ml/m: 189.0 <br /> Determined by(method): Metering psi; 10 <br /> Leak rate in gph: Calib. leak in gph: 3.00 3.90 <br /> Result: Results: PASS FAIL <br /> COMMENTS COMMENTS <br /> ULLAGE TEST RESULTSTestMethod: LINE TEST RESULTS Test type: <br /> Test time: Material: DW FIHERG <br /> Ullage volume: Diameter(in): 2.0 <br /> Uliage pressure: Length(ft): 100.0 <br /> Results: Test psi: <br /> Bleedback cc: <br /> DATA FOR UTS-4T ONLY: Test time(min); <br /> Test 1:Start time: <br /> Time of test 1: Finish psi: NOT NOT NOT NOT <br /> Temperature: NOT Vol change cc: TESTED TESTED TESTED TESTED <br /> Test 2:Start time: <br /> Flow rate(cfh): TESTED Finish psi: <br /> Time of test 2: Vol change cc: <br /> Test 3:Start time: <br /> Temperature: Finish psi: <br /> Flow rate(cfh): Vol change cc: <br /> Time of test 3: Final gph; <br /> Temperature: Result; <br /> Flow rate(cfh); Pump type: PRESSURE <br /> COMMENTS Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: UNKNOWN <br /> Printed 41105;2901 17:52 KOHLMEYER <br />