My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DUCK CREEK
>
3633
>
2300 - Underground Storage Tank Program
>
PR0232461
>
COMPLIANCE INFO 2004 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:07 PM
Creation date
11/4/2018 3:40:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2004 - 2006
RECORD_ID
PR0232461
PE
2361
FACILITY_ID
FA0003758
FACILITY_NAME
RYDER TRUCK RENTAL #1071
STREET_NUMBER
3633
STREET_NAME
DUCK CREEK
STREET_TYPE
DR
City
STOCKTON
Zip
95215
APN
17331001
CURRENT_STATUS
01
SITE_LOCATION
3633 DUCK CREEK DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\D\DUCK CREEK\3633\PR0232461\COMPLIANCE INFO 2004 - 2006.PDF
QuestysFileName
COMPLIANCE INFO 2004 - 2006
QuestysRecordDate
4/25/2018 10:46:56 PM
QuestysRecordID
3869444
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />-�A <br />40P Tanknolagy <br />8501 N MOPAC EXPRESSWAY, SUITE 400 WORK ORDER NUMBER: 2234627 <br />TEST BATE: 43/28/45 AUSTIN, TEXAS 78759 (512)451-6334 <br />CLIENT: RYDER FUEL COMPLIANCE SITE: RYDER 1.071A <br />Tank ID: 12k <br />Product: DIESEL <br />Capacity in gallons: 12,110 <br />Diameter in inches: 96.00 <br />Length in inches: 391 <br />Material: DW STEEL <br />1 Tank manifolded: NO <br />Vent manifolded: YES <br />Vapor recovery manifolded: NO <br />Overfill protection: YES <br />Overspill protection: YES <br />Installed: ATO <br />CP installed on: / / <br />Bottom to top fill in inches: 168.8 <br />Bottom to grade in inches: <br />Fill pipe length in inches: 72.8 <br />Fill pipe diameter in inches 4.0 <br />Stage I vapor recovery: NONE <br />Stage 11 vapor recovery: NONE <br />COMMENTS <br />Note that line "A" refers to the Main supply line, line "B" refers to sat 1, line "c" refers to sat <br />2, line "d" refers to sat 5. For information on sat 6 refer to "RESERVE DIESEL line "d". <br />17ANK TEST RESULTS Test Method: <br />LEAK DETECTOR TEST RESULTS Test method: <br />PSI at tank bottom: <br />Newlpassed Failedlreplaced New/passed <br />Failed/replaced <br />Fluid level in inches: <br />L.D. #1 L.D. #1 L.D. #2 <br />L.D. #2 <br />UFT/OFT: <br />Make: <br />VAPORLSSS <br />Fluid volume in gallons: <br />Model: <br />LD2000 <br />Tank water level in inches: <br />S/N: <br />03091053 <br />Test time: NOT <br />Open time in sec: <br />3.00 <br />Number of thermisters: TESTED <br />Holding psi: <br />27 NOT <br />Specific gravity: <br />Resiliency cc: <br />130 TESTED <br />Water table depth in inches: <br />Test leak rate ml/m: <br />189.0 <br />Determined by (method): <br />Metering psi: <br />15 <br />Leak rate in gph: <br />Calib. leak in gph: <br />3.00 <br />Result: <br />Results: <br />PASS <br />COMMENTS <br />COMMENTS <br />ULLAGE TEST RESULTS Test Method: <br />LINE <br />TEST RESULTS <br />Test type: <br />Test time: <br />Material: DW <br />FIBERG DW FIBERG DW FIBERG <br />FIBERGLASS <br />Uiiage volume: <br />Diameter (in): <br />2.0 2.0 2.0 <br />Length (ft): <br />100.0 25.0 25.0 <br />Ullage pressure: <br />Test psi: <br />Results: <br />Bleedback cc: <br />Test time (min): <br />DATA FOR UTS-4T ONLY: <br />Test 1: Start time: <br />Time of test 1: <br />Finish psi: <br />NOT NOT NOT <br />NOT <br />Temperature: NOT <br />Vol change cc: <br />Test 2: Start time: <br />TESTED TESTED TESTED <br />TESTED <br />Flow rate (cfh): TESTED <br />Finish psi: <br />Time of test 2: <br />Vol change cc: <br />Test 3: Start time: <br />Temperature: <br />Finish psi: <br />Flow rate (cfh): <br />Vol change cc: <br />Time of test 3: <br />Final gph: <br />Temperature: <br />Result: <br />Flow rate (cfh): <br />Pump type: PRESSURE <br />PRESSURE PRESSURE <br />PRESSURE <br />Pump make: RED <br />JACKET NONE NONE <br />NONE <br />COMMENTS <br />COMMENTS <br />Impact Valves Operational: YES <br />Printed 04/1512005 07:52 SBOWERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.